6 Disassembly and Reassembly
6.1 Required tools
•
Hoist and Strap
•
Socket Sizes (mm): 12, 14, 16, 19, 20
•
Torque Wrench for reassembly Wrench Sizes (mm): 12, 16, 20
•
Allen Wrenches (mm): 12, 14, 16, 19, 22
•
Pry Bars
•
Induction Bearing Heater
•
Feeler Gauges
•
Dial Indicator
•
Cleaning Agents
6.2 Preparation for disassembly
WARNING:
Mixers may handle hazardous and/or toxic fluids. Skin and eye protection are required. Pre-
cautions must be taken to prevent injury or environmental contamination.
NOTICE:
Before disassembling the mixer for overhaul, ensure all replacement parts are available.
1.
Lock out power supply to driver.
2.
Shut off all valves controlling flow to and from mixer.
3.
Drain liquid from piping, flush mixer if necessary.
4.
Disconnect all auxiliary tubing and piping.
5.
Remove coupling guard.
6.
Disconnect coupling.
6 Disassembly and Reassembly
3501 Installation, Operation, and Maintenance Instructions
37