2.- PACKING AND STORAGE
Code formulation
P:
PP -
C
: PP - Ceramic
I
:
AISI316
- Ceramic
F
: PVDF - Ceramic
T
: PTFE - Ceramic
PEUHMW
3/4"
X
: 1”1/4
Y
: 1”1/4 NTP
L
: 6x12 (6x8 PVDF)
M:
AC1:
0.43 KW 110V
AC2:
0.43 KW 230V
AC3
:
1.2 KW 230V
P24:
24 mm
P34
: 34 mm
P49
: 49 mm
P61
: 61 mm
P77
: 77 mm
P95
: 95 mm
P110
: 110 mm
D69
: 69 mm
D95
: 95 mm
D115
: 115 mm
D142
: 142 mm
D163
: 163 mm
ø
ø
ø
ø
ø
ø
ø
ø
ø
ø
ø
ø
DIAMETER
CYLINDER-PISTON
CONNECTION
73 - AC2 P 4 4 - P61 P B M
VALVE-BALL
P:
PP - Soda.
B
: PP - Boro.
I
: SS316 - SS316
F
: PVDF - Boro.
T
: PTFE - Boro.
1:
26 Strokes/min.
2
: 43 Strokes/min.
3
: 72 Strokes/min.
4
: 144 Strokes/min.
FREQUENCY
HEAD
1:
4,5 mm
2
: 7,5 mm
3
: 9 mm
4
: 15 mm
STROKE
MOTOR
P:
Piston
D
: Diaphragm
The original packing is prepared so that carriage and storing of the product do
not cause any damage to the product, as long as this is done far from heat
sources and in dry, ventilated spaces.
The packing contains:
- DOSTEC-AC dosing pump
- Handbook
- Oil: AC1/2 250 m3
AC3 700 m3
5
Summary of Contents for DOSTEC-AC
Page 1: ...ENGLISH DOSTEC AC ...
Page 59: ......