
Chapter
4
Getting Started
4-3
Preparations
Follow the instructions in this chapter and keep in the order the topics are presented.
Basic procedure and overview:
1. Open the recorder
2. Switch on recorder
3. Check date and time, and reset if necessary
4. Program the recorder
5. Close the recorder
6. Carry out test punches
Open the Recorder
If the recorder is not yet opened, remove the front cover as described in chapter 3,
"Installation".
Powering Up The Time Recorder
The recorder is provided with a separate power switch. This power switch is located
inside the recorder, on the left hand side of the CPU-board.
Fig.12: PC-board with power switch
Summary of Contents for PERFECT 2030
Page 1: ...PERFECT 2030 Operating Manual ...
Page 2: ......
Page 10: ...0 4 Contents Chapter 0 ...
Page 20: ...2 6 Features Chapter 2 ...
Page 32: ...3 12 Installation Chapter 3 ...
Page 88: ...4 56 Getting Started Chapter 4 ...
Page 110: ...5 22 Operation Chapter 5 ...
Page 118: ...6 8 Trouble Shooting Chapter 6 ...
Page 123: ...Appendix A Technical Specifications A 1 Appendix A Technical Specifications ...
Page 125: ...Appendix B Default Program Settings B 1 Appendix B Default Program Settings ...
Page 128: ...B 4 Default Program Settings Appendix B ...
Page 129: ...Appendix C Program Settings C 1 Appendix C Program Settings ...
Page 133: ...Appendix D Conversion table D 1 Appendix D Conversion Table for Minute Print Formats ...
Page 135: ...Appendix E Sales and Service Dealer E 1 Appendix E Local Sales and Service Dealer ...
Page 137: ......