
Linear units with toothed belt drive: LEZ 1/LEZ 2/LEZ 3/LEZ 9
Assembly instructions
Page 29
3
Commissioning, general information
The linear unit is commissioned after assembling the relevant drive modules and the necessary wiring.
Follow the relevant instructions in the documentation of the motor modules, output stages or complete
controller used.
Procedure:
Switch off the controller and check that it is isolated.
Connect theencoderlead.
Connect the motor lead.
Connect the reference switch lead.
Switch on the controller and check that the reference switch is working correctly.
Carry out a test run
-
first at a slow travel speed,
-
thenunderworkingconditions
Incorrect assembly (including loading on the axis system), cabling or commissioing
increases the risks.
Unauthorised individuals should not be given access to the controller or the switch cabinet.
There is a risk of electric current causing injuries. This is the responsibility of the individual
who installed the machinery.