background image

FORTIS 4 PERSON

WORKSTATION

Assembly Instructions

Thank you for your purchase!

 

Iron Age Office furniture is uniquely and individually 

fabricated.  For this reason, your furniture is pre-assembled

 and labeled before shipping.  Labels are marked on the 

underside of the furniture.  Most furniture is then 

deconstructed prior to shipping.  Pieces that uniquely 

correspond can typically be found on the same pallet.  

 

Assembly is best completed by keeping the pieces that

correspond together.  Clear your work area of anything that 

could scratch furniture surfaces.  If possible, cover your 

work area with a clean, soft blanket. Carefully flip 

any wooden tops over and inspect the bottom sides for markings.  

Match legs, flat brackets, etc. 

to the appropriate labels.

 

If you need further assistance of any kind, 

please contact:

Iron Age Office Operations Manager

Henry Dover

678-725-1473 (c)

[email protected]

  

Summary of Contents for FORTIS 4 PERSON L-SHAPE WORKSTATION

Page 1: ...uniquely correspond can typically be found on the same pallet Assembly is best completed by keeping the pieces that correspond together Clear your work area of anything that could scratch furniture su...

Page 2: ...eive extra hardware with your unit 14 10 LAG BOLT QTY 68 SCREEN BOLT QTY 20 SCREEN NUT QTY 20 LEVELING FOOT QTY 9 9 16 Crescent Wrench 15 16 Crescent Wrench 3 8 Hex Drive 3 Square Drive Tools Required...

Page 3: ...GHT TABBED LEG MAIN TOP SECOND TOP FOURTH TOP BACK LEFT TABBED LEG THIRD TOP 1 2 3 4 5 M1 M2 M3 M4 BACK SHARED LEG 6 T TROUGH SB SUPPORT BAR 1 ES1 2 ES2 3 M2 DS SB 4 T M1 T 5 ES3 6 ES4 7 M4 SB M3 DS2...

Page 4: ...od tops Tabbed legs should be placed so that tabs are facing each other Screw in 4 14 10 Lag bolts in legs 1 3 5 and 7 1 M3 M4 M2 M1 M4 M3 M1 M2 3 7 6 5 1 2 4 Screw in 2 14 10 Lag bolts in legs 2 6 an...

Page 5: ...to each leg with 9 16 crescent wrench 4 STEP 6 Flip M2 desk to an upright position Secure but do not tighten bottom support bar with 2 screen bolts and 2 screen nuts 1 5 4 2 6 7 3 STEP 5 Attach screen...

Page 6: ...vider screen on the underside of M1 top Screw in lag bolts into divider screen and shared legs with a 3 square drive 1 DS1 STEP 7 Align divider screen to M2 top Secure divider screen to underside of M...

Page 7: ...d 4 screen nuts M1 ES1 1 2 STEP 10 Attach screen to back tabbed legs of M4 desk with 4 screen bolts and 4 screen nuts M4 7 6 ES4 STEP 11 Flip M4 desk to upright position Align M4 top to M2 desk Secure...

Page 8: ...2 screen nuts M4 SB STEP 13 Align divider screen to M4 top Secure divider screen to underside of M4 top with 4 lag bolts on each side DS2 M4 STEP 14 Flip M3 desk to upright position Align M3 top to M...

Page 9: ...egs of M3 desk with 4 screen bolts and 4 screen nuts ES3 M3 5 6 STEP 16 Tighten both bottom support bars SB STEP 17 Align troughs to underside of joined desks using markings T 10 T Screw in 6 trough s...

Page 10: ...oy your desk CARE INSTRUCTIONS To care for either wooden or metal surfaces of Iron Age Office products gently wipe with a soft cloth dampened with water and a mild dishwashing liquid Once satisfied dr...

Reviews: