www.irrobot.com
18
3) Installing Robots and Ball
- Open the locks located on the side of cover then pull up the cover.
①
Lock and Handle
②
Open two locks.
③
Full up the handle.
④
Complete stand up
the handle
⑤
Pull up with two handles.
⑦
Check the playground is clean.
⑧
Pull down the cover.
⑨
Watch out you hand jammed.
Return the handle inside and
close the locks.
⑥
Full up the cover until
shock-up out fully.
- Put the robots and ball in the playground.
Î
Read page 20, “2.3 Handling the robot” first before put the robots in.
- Then, pull down the cover carefully.
Î
Watch you hand when you make it close.
Î
Check the playground is clean against any dusts and conductors.
4) Connect a main power cable
- Connect a main power cable on the backside with an outlet.
-
Don’t treat electricity with wet hand
Summary of Contents for Marubot Football League 4 Players
Page 45: ......