
| Maintenance
126
YLS-K
NOTICE
Danger of damage to the product due to incorrect re-
pair
Incorrectly performed replacement and repair work
can result in damage to the product.
ð
Ensure that the work below is performed only
by IPG service personnel.
9.2.1 Replacing a laser module
Test point
Laser modules
Test method
Performance measurement
Time interval
In the event of a failure
Time duration
~ 3 hours
Performance
IPG Laser GmbH
Contact
The contact information of the com-
petent IPG service department can
be found in the paragraph
in the event of malfunctions [
.
9.2.2 Replacing the feeding fiber
Test point
Feeding fiber
Test method
Measurement of the transmission
and beam quality
Time interval
In the event of a fault
Time duration
~ 5 hours
Performance
IPG Laser GmbH
Contact
The contact information of the com-
petent IPG service department can
be found in the section
.