Set-Up Procedures
USC 2024-
BB 3” UNIFORM SEMI-AUTOMATIC CASE SEALER
4-12
4.12 T
APE
T
HREADING
1. Thread the Tape Tail over the Peel Off Roller (refer to Figure 4-14).
2. Thread the Tape over and around the first
“smooth” Guide Roller.
3.
Continue to thread the tape over and around the “knurled” Clutch Roller.
4.
Pass the tape up and over the second “smooth” Guide Roller.
5. Continue threading the tape over and behind the final Knurled Guide Roller.
6. Thread the tape through the cut-out provided in the Tape Guide Shoe
and pull the tape through the front
Application Roller, make sure that the tape is retained in the Tape Guide Shoe.
7. Cut off the folded tape.
8. Replace the Tape Head to its initial position in the machine.
Figure 4-12 Tape Threading
Summary of Contents for Interpack USC 2024-BB 3
Page 18: ...USC 2024 BB 3 UNIFORM SEMI AUTOMATIC CASE SEALER Important Safeguards 2 7 Notes...
Page 24: ...USC 2024 BB 3 UNIFORM SEMI AUTOMATIC CASE SEALER Specifications 3 5...
Page 39: ...Set Up Procedures USC 2024 BB 3 UNIFORM SEMI AUTOMATIC CASE SEALER 4 14 Notes...
Page 45: ...Operating Instructions USC 2024 BB 3 UNIFORM SEMI AUTOMATIC CASE SEALER 5 6 Notes...
Page 49: ...Troubleshooting USC 2024 BB 3 UNIFORM SEMI AUTOMATIC CASE SEALER 6 4 Notes...
Page 54: ...USC 2024 BB 3 UNIFORM SEMI AUTOMATIC CASE SEALER Preventive Maintenance 7 5 Notes...
Page 56: ......