Goodrive300-01A series VFD for air compressor
Commissioning instruction
-25-
4 Commissioning instruction
4.1 Commissioning instruction for the dual-VFD air compressor
4.1.1 Wiring diagram of the dual-VFD air compressor system
R
S
T
R
S
T
GD300-01A
PE
COM
COM
S3/PTC
S1
Emergency
stop
PTB1
PTA1
P1-
P1+
RO1A
RO1C
RO2C
RO2A
Solenoid coil
220V
110V
0V
R
S
Power-
frequency
transformer
AO1
GND
PT100
Discharge
pressure
Oil gas
temperature
485+
485-
0V
24V
CGND/PE
M
Cooling fan
COM
S1
AI2
GND
GD20
V
W
U
R
S
T
M
Main motor
V
W
U
PE
Cooling fan
Start/stop signal
Analog
output
Fan fault
COM
S2
RO1A
RO1C
Fan VFD
HMI
IoT module
Figure 4-1 Wiring diagram for dual-VFD air compressor system
4.1.2 Commissioning steps for the dual-VFD air compressor
It is recommended to use touch screen special for INVT air compressor to display and commission.
Note:
If you use a controller from another manufacturer, contact INVT technical support.
All the parameters displayed in the interfaces are subject to actual displayed content.
The commissioning steps are as follows:
1. Perform wiring according to Figure 4-1 and ensure that the VFD for air compressor and the housing
of the air compressor are grounded properly.
2. After power up, the following interface is displayed.