22
23
INSTALLATION AND ASSEMBLY
INSTALLATION AND ASSEMBLY
Ventilation System iV-Twin+
•
Installation and Operating Instructions
Ventilation System iV-Twin+
•
Installation and Operating Instructions
NOTE:
Accumulation of condensation
water in the wall sleeve.
Damage to the exterior wall and masonry as
well as the building material!
• Fix the wall installation sleeve with a slope
of 1 – 2° to the outer wall.
►
Fix the wall sleeve on the inside and outside walls
with the mounting wedges so that it has a gradient
of 1 – 2° to the outside wall.
►
Check the inclination of the wall sleeve with a spirit
level.
1 – 2°
NOTE:
Avoid contamination of the wall
sleeve and the fastening
elements!
• Before foaming the free space between
the wall sleeve and masonry, insert the
Styrofoam disks.
• Do not remove the thread locks of the
fastening elements until the inner cover
has been fitted.
►
Insert the Styrofoam disks into the wall sleeve on
the inside and outside walls.
►
Align the two lateral mounting elements of the wall
sleeve horizontally.
►
Before foaming, stabilise the wall sleeve with a
suitable material so that it does not deform.
►
Foam the free space between the wall installation
sleeve and masonry all around with non-pressing
2-component installation foam.
NOTE:
Interruption of the thermal
insulation composite system.
Damage to the building substance!
• During installation, guide the wall structure
back up to the wall installation sleeve.
• Observe the necessary sealing levels.
►
Cut off the 2-component mounting foam and
protruding mounting wedges flush with the outer
and inner walls.
Make sure
that you
do not
damage the fan BUS.
4.5
Mount the external closure
NOTE
Mounting on unfinished outer wall
leads to damage of the outer wall!
• Do not install the external closure until the external wall has been completed and completely
cured.
NOTE
Penetration of condensation water and/or algae accumulation around the weather
protection hood
leads to damage to the masonry/external wall and/or discolouration of the facade!
• Prior to installation of the external closure apply all sealing strips on the weather protection
hood circumferentially.
• Before installation, make a biocidal presetting/water-repellent pretreatment of the surface
weather protection hood (Please consult your planner!).
►
Slide the base plate onto the protruding wall
sleeve.
The protective grille is directed towards the floor.
There are notches for the wall sleeve in the air
volume flow separation.
►
Align the base plate with a spirit level.
►
Mark the four holes:
Outer holes (blue arrow): Brickwork
Inner holes (green arrow) Simplex
ø 8 mm
►
Drill the four holes with Ø 8 mm, min. 50 mm
deep.
Spirit level, pen, drill with drill bit Ø 8mm, cordless screwdriver, dowel (for insulated
outer walls insulation dowel), permanently elastic outer sealing compound, sealing
tape, screws.
Prerequisite:
The outer wall is finished and level.
The wall sleeve is mounted.
►
Remove the Styrofoam disk from the wall installa-
tion sleeve.
The wall sleeve is mounted.
24 h
Simplex