Retrofit G6+InvencoLink GVR Encore 500S (US) Installation Guide
2 Safety & Compliance Information
This section introduces the hazards and safety precautions associated with installing, inspecting,
maintaining or servicing the G6 OPT. Before proceeding, check the relevant hazard and safety
information. Fire, explosion or electrical shock could occur and cause death or serious injury if these safe
service procedures are not followed.
2.1
Preliminary Precautions
You are working in a potentially dangerous environment of flammable fuels, vapour, and high voltage.
Only trained or authorized individuals knowledgeable in the related procedures should install, inspect,
maintain or service this equipment.
2.2
Emergency Total Electrical Shut-Off
Locate the forecourt emergency fuel shut-off valves and electrical isolation breakers. Understand how to
use these, should they be required. Locate the switch or circuit breakers that shut-off all power to all
fuelling equipment and dispensing devices.
2.3
Total Electrical Shut-Off Before Access
Any procedure requiring access to electrical components or the electronics of a pump/dispenser requires
total electrical shut-off of that unit. Understand the function and location of this switch or circuit breaker
before inspecting, installing, maintaining, or servicing the G6/Optic 5 OPT.
2.4
Evacuation, Barricading and Shut-Off
Any procedures requiring accessing a pump/dispenser head requires the following three actions:
•
An evacuation of all unauthorized persons and vehicles
•
Using safety tape or cones as barricades to the affected units
•
A total electrical shut-off of the affected unit(s)
2.5
Read the Manual
Read, understand and follow this manual and any other labels or related materials supplied with the
equipment. If you do not understand a procedure, call an Invenco Authorized Service Centre or Invenco
Service Officer. It is imperative to your safety and the safety of others to understand the procedures
before beginning work.