Before installing the battery storage system, it must be ensured that
–
The foundation has been prepared in line with the specifications
–
The connections on the AC-distribution side have been prepared
–
The necessary installation tools are available
5.4
Disassembling the transport pallet
The battery storage system is delivered on a transport pallet. The fixing screws
must be removed prior to unloading.
Illustration 11: Disassembling the transport pallet - removing the fixing screws
•
Remove the fixing screw (1) at each corner.
Summary of Contents for scalebloc 0.5C
Page 33: ...2 Safety 2 10 Obligations of the system manager INTILION scalebloc 0 5C 31 ...
Page 34: ......
Page 46: ...4 Transport and storage 3 3 Technical specifications 44 INTILION GmbH ...
Page 77: ...5 Installation 5 12 Establishing the mains connection INTILION scalebloc 0 5C 75 ...
Page 78: ......
Page 98: ...6 Commissioning 6 8 Contacting the Hoppecke Service team 96 INTILION GmbH ...
Page 100: ......
Page 102: ...8 Fault 100 INTILION GmbH ...