background image

INSTALLATION

As standard the generator is delivered with a 5m cable without any connector. An authorized per-

son should connect the cable to a 2-pole safety switch. The outgoing cable from the generator can 

be either on the backside or the front side. As standard the cable is fixed on the front side.

Operation Manual 

AirMaid® C

The installation of the generator MUST be vertical, like 

the figure below. Make sure that the position is safe so 

that the generator is not exposed to water or mechan-

ical damage both inside and outside the container.  

A typical installation is shown in the picture.

Prepare a rectangular hole in the container. Width 

should be 185 mm and height 295 mm. Prepare l0xM6 

holes according to the layout drawing on the last page 

of this manual.

Fix the sealing of NEOPREN rubber around the hole 

and install the generator. Make sure that the sealing is 

well fixed around the generator and fix the stainless 

steel frame at last with10xM6 screws from the outside. 

START UP

The ozone generator is equipped with an asymmetrical timer to control the ozone 

production.

To adjust the timer the main power has to be switched OFF behind the front 

cover. The period of ozone production (ON) can be adjusted T

ON

. The period of 

ozone production (OFF) can be adjusted by the T

OFF

. As standard the settings is 

made according to the sample below.

Sample

The settings in the picture are made according to:

T

ON

1-10 s 

T

OFF

: 0-60s

 

2  

 

5

Ozone is produced in 2s and then it goes down in 30s. By combining the white knob (period) and 

blue knob (range) the time period can be adjusted between 0,1s to 100h.

AirMaid® 2000 C

500 C

2000 C

5000 C

Reviews: