All pipe plugs have been installed.
1.
With 2 sets
Square Neck Screw(No.
45),Arc washer
(No.41
),
Spring washer
(No.
58)
& Lock Nut(No.63
) attach Front bottom
tube
(No.
18)on main frame
(No.1
).
2.
With 2 sets
Square Neck Screw(No.45
),ARC washer
(No.41
),
Spring washer
(No.
58)
& Lock Nut(No.63
) attach Rear bottom tube
(No.1
9)on
Adjustable bracket
(No.
2).
3.
A: Connect the Meter wire (
No.27), Heart rate wire 1(No.30
) of the
upper and lower sections of the electronic table connection, and then connect the terminal of the lower end of
the 8-section spinner body (
No.
24
) firmly with the
resistance cable (
No.
23
). (Note: first of all the output
adjustment knob to the "+" direction to the end (at this time the output of the spinner terminal extension to the
longest), according to the figure of the joint terminal sleeve in the output adjustment wire connection hook, pull
up, the output adjustment of the upper end stuck into the
box slot. If the upper end of the output fine adjustment
body line cannot just be stuck into the adjustment box slot, please turn the lower end of the adjustment box nut
to the appropriate position, so that the output fine adjustment body line at the top of
the clip just stuck into the
adjustment box slot. (See Figure 3-A, B and C)
B: Take
over by 4 sets of
Half-Roundhead Hex Bolt (
No.
48), Spring washer(
No.
58) and ARC
washer (No.41
) will hand
over
Handlebar support (
No.
4) connected to the frame (
No.
1) tighten. (See Figure3-D)
Summary of Contents for IT-R240
Page 1: ...IT R240 INTER TRACK Luxury Magnetic Recumbent Bike...
Page 3: ......