Intel True Scale Fabric Switches 12200 Installation Manual Download Page 43

True Scale Fabric Switches 12000 Series Hardware

July 2015

Installation Guide

Order Number: G91928004US

43

12000 Series Switches

8. Installing the chassis in the rack: Align the chassis with the rack. Raise the chassis 

using a pallet jack such that the bottom of the chassis is at or slightly higher than 

the top surface of the support shelf pre-installed in the rack. Lock the pallet jack 

wheels. Use a group of people to push the chassis from the front to slide it off the 

pallet and on the support shelf. The chassis should be inserted into the rack until 

the rear of the chassis base is against the rear support bracket. 

Figure 36.

Positioning the Switch

Figure 37.

Sliding the Switch off the Pallet

Summary of Contents for True Scale Fabric Switches 12200

Page 1: ...Order Number G91928004US True Scale Fabric Switches 12000 Series Hardware Installation Guide July 2015...

Page 2: ...ATH ARISING IN ANY WAY OUT OF SUCH MISSION CRITICAL APPLICATION WHETHER OR NOT INTEL OR ITS SUBCONTRACTOR WAS NEGLIGENT IN THE DESIGN MANUFACTURE OR WARNING OF THE INTEL PRODUCT OR ANY OF ITS PARTS In...

Page 3: ...Kit Contents 21 2 4 2 Installation Tasks 21 2 5 12800 120 Installation 23 2 5 1 Mounting Hardware Kit Contents 23 2 5 2 Installation Tasks 24 2 6 12800 180 Installation 30 2 6 1 Mounting Hardware Kit...

Page 4: ...al Port Pinouts 87 D 12800 Leaf Module Guidelines 89 D 1 12800 040 89 D 1 1 Single Management Module 89 D 1 2 Dual Management Modules 89 D 2 12800 120 89 D 2 1 Single Management Module 89 D 2 2 Dual M...

Page 5: ...lip Nut Orientation 32 24 Support Rail Installation 32 25 Flat Bracket Installation 33 26 Mounting Flange Installation 34 27 U Bracket Installation 35 28 Cable Management Guide Installation 36 29 1280...

Page 6: ...3 65 Serial Port Pinouts 87 66 12200 Management Card Slot Cover 92 67 12200 Management Card Insertion 93 68 12200 Management Card Insertion 2 94 69 12200 Management Card Insertion 3 95 70 12300 Fan Po...

Page 7: ...91928004US 7 12000 Series Switches Date Revision Description May 2013 001US Initial release January 2014 002US Updated document File Info meta data August 2014 003US Update Support link in Section 1 7...

Page 8: ...12000 Series Switches True Scale Fabric Switches 12000 Series Hardware Installation Guide July 2015 8 Order Number G91928004US...

Page 9: ...egulatory information Appendix C provides serial port pinout information Appendix E provides FRU replacement information 1 1 Intended Audience This manual is intended to provide network administrators...

Page 10: ...with UPPERCASE Press CTRL P Press the UP ARROW key Text in italics indicates terms emphasis variables or document titles For example For a complete listing of license agreements refer to the Intel So...

Page 11: ...sembly used in the switch chassis 1 6 License Agreements Refer to the Intel Software End User License Agreement for a complete listing of all license agreements affecting this product 1 7 Technical Su...

Page 12: ...12000 Series Switches True Scale Fabric Switches 12000 Series Hardware Installation Guide July 2015 12 Order Number G91928004US...

Page 13: ...ent rack to earth ground Note Provide enough room to work on the equipment Clear the work site of any unnecessary materials Make sure the equipment will have enough clearance for front and rear access...

Page 14: ...use plenum rated cable or refer to IEC standard 850 2 1 1 3 Cable Handling and Bend Radius Provide proper strain relief by adhering to the following guidelines For copper cable the temporary 90 degre...

Page 15: ...r the UPS to transfer from utility power to full load battery power The longest potential time period the UPS might be required to supply backup power Whether the UPS unit provides online protection 2...

Page 16: ...the equipment The equipment will have enough clearance for front and rear access The IB cables can be accessed easily Water or moisture cannot enter the switch The ambient temperature stays between 50...

Page 17: ...Figure 4 On the 12300 hat rails are installed with mounting ears towards the power supply side of the switch On the 12200 hat rails are installed with mounting ears towards the port side of the switch...

Page 18: ...dware Installation Guide July 2015 18 Order Number G91928004US 3 Slide the switch into the mounting rails and fasten with M6 screws one 1 per side Torque screws to 30in lb Figure 5 Installing the Rack...

Page 19: ...32 screws M6 cage nuts M6 screws 2 3 2 2 Installation 1 Install the hat rails with mounting ears towards the port side of the switch Fasten with three 3 6 32 screws per rail Torque screws to 8in lb 2...

Page 20: ...32 screws M6 cage nuts M6 screws 2 3 3 2 Installation 1 Attach the L brackets with mounting ears towards the port side of the switch Fasten to the switch with three 3 6 32 screws per L bracket Torque...

Page 21: ...ing kit contains all of the necessary parts for installing and mounting the switch into a 19 4 post server rack with a distance between front and rear rack posts ranging from 28 33 711mm 838mm Support...

Page 22: ...Hardware Installation Guide July 2015 22 Order Number G91928004US 2 Install support rails in the rack Fasten with two 2 M6 screws per EIA rail to pre installed clip nuts and torque to 30 in lb Figure...

Page 23: ...o the rack with four 4 M6 screws Torque to 30in lb 5 If applicable replace the door s on the rack 2 5 12800 120 Installation Note The mounting kit contains all of the necessary parts for installing an...

Page 24: ...r improved stability orient the clip nuts as shown i e orient the flanges horizontally Note It is recommended that 12800 120 be installed into the rack at 5U or 6U location This locates the chassis ap...

Page 25: ...y 2015 Installation Guide Order Number G91928004US 25 12000 Series Switches 4 Install two 2 rear mounting Hat Brackets on the chassis and fasten with 8 32 screws There are four 4 screws per bracket To...

Page 26: ...he front of the rack Install the chassis in the rack Warning To avoid injury do not manually lift the chassis when fully loaded Use a mechanized lift whenever possible For a manual lift unload the pro...

Page 27: ...itches 12000 Series Hardware July 2015 Installation Guide Order Number G91928004US 27 12000 Series Switches 6 Fasten the chassis to the rack with eight 8 M6 screws Torque to 30in lb Figure 18 Mounting...

Page 28: ...True Scale Fabric Switches 12000 Series Hardware Installation Guide July 2015 28 Order Number G91928004US 7 Slide two 2 C brackets over the Hat brackets that are pre installed on the chassis Figure 19...

Page 29: ...are July 2015 Installation Guide Order Number G91928004US 29 12000 Series Switches 8 If applicable install the optional cable management guides Fasten to the EIA rails with M6 screws Torque all screws...

Page 30: ...Installation 2 6 1 Mounting Hardware Kit Contents Note The mounting kit contains all of the necessary parts for installing and mounting the switch into a 19 4 post server rack with a distance between...

Page 31: ...ck is used for installation of 12800 180 switches Wide 19 mount server racks are typically 30 32 in total width 2 6 3 Installation Tasks Note It is recommended that 12800 180 is installed into the rac...

Page 32: ...Install support rails in the rack Fasten with two 2 M6 screws per EIA rail to pre installed clip nuts and torque to 30 in lb 4 Install four 4 rear mounting brackets to the chassis and fasten with 8 3...

Page 33: ...ully loaded do not lift manually Use a mechanized lift only If a manual lift is necessary first unload all field replaceable units FRUs to minimize weight Use a team of people appropriate to the weigh...

Page 34: ...Scale Fabric Switches 12000 Series Hardware Installation Guide July 2015 34 Order Number G91928004US 7 Slide four 4 C brackets over the HAT brackets that are pre installed on the chassis Figure 26 Mo...

Page 35: ...are July 2015 Installation Guide Order Number G91928004US 35 12000 Series Switches 8 If applicable install the optional cable management guides Fasten to the EIA rails with M6 screws Torque all screws...

Page 36: ...rack posts Mounting Kit containing Support Shelf HAT Brackets C Brackets 10 Mounting screws M6 Mounting Screws M6 Clip Nuts 2 7 2 Selecting a Rack 12800 360 is the largest in the 12800 series of switc...

Page 37: ...ating Rack Mounting Posts for Front and Back Cable Routing In a typical rack front EIA rails are positioned approximately 50mm from the front face of a rack With a chassis mounted flush with the front...

Page 38: ...available from rack suppliers 2 7 3 Installation Tasks Note It is recommended that 12800 360 is installed into the rack at 5U or 6U location This will locate the chassis approximately 12 from the floo...

Page 39: ...our 4 mounting brackets to the support shelf as shown in Figure 33 Align the brackets with B marks on a support shelf and fasten with six 6 M6 HEX screws per bracket Use a HEX socket wrench to tighten...

Page 40: ...s Hardware Installation Guide July 2015 40 Order Number G91928004US 4 Install the support shelf into the rack Fasten the M6 screws to pre installed clip nuts and torque to 30 in lb There are three 3 s...

Page 41: ...nload all field replaceable units FRUs to minimize weight Use a team of people appropriate to the weight of the product and in conjunction with applicable laws and guidelines 6 Orientation of the chas...

Page 42: ...Use pallet jack to move the chassis Orient the chassis on a pallet in front of the rack as shown Chassis rear should be facing front of the rack For installations in racks arranged in rows distance be...

Page 43: ...e bottom of the chassis is at or slightly higher than the top surface of the support shelf pre installed in the rack Lock the pallet jack wheels Use a group of people to push the chassis from the fron...

Page 44: ...en to the base of the chassis with five 5 M6 screws Fasten to the support shelf with seven 7 10 32 screws Torque to 30 in lb 10 Fasten the rear of the chassis to the rack Fasten the rear support brack...

Page 45: ...Attach the cable management guides If applicable attach the cable management guides to the front and rear EIA mounting rails and fasten with M6 screws to the pre installed clip nuts The guides should...

Page 46: ...uipment to the Ports and Power On the System Note Before connecting equipment it is important to understand the locations of the serial and Ethernet ports on the 12200 12300 and 12800 series For the 1...

Page 47: ...itches 12000 Series Hardware July 2015 Installation Guide Order Number G91928004US 47 12000 Series Switches Figure 41 12200 and 12300 Serial and Ethernet Ports Figure 42 12800 Series Serial and Ethern...

Page 48: ...tation Doing this prevents all of the rotational forces from acting right at the connector terminations Caution It is important to provide strain relief for the IB cable connector 2 8 0 1 Connecting P...

Page 49: ...the System For the First Time 2 9 1 12800 Series Management Module Protective Label Guidelines A management module installed in a 12800 system may have a protective label installed as shown in Figure...

Page 50: ...g area do the following 1 Disengage the thumb screw and partially rotate the lever as shown in Figure 45 2 Fold back the label from the thumb screw hole Re engage the lever and tighten the thumb screw...

Page 51: ...rocedures 1 Power up the switch 2 From its flash image on the management module the switch begins its boot process Note If the DB9 port of the SEEB or the RS232 port on the 12200 12300 is connected to...

Page 52: ...ssisIpAddr h ipaddress m netMask where h ipaddress is the new IP address in dotted decimal format that is xxx xxx xxx xxx and m netMask is the new subnet mask in dotted decimal format 2 To change the...

Page 53: ...92 168 100 11 12800 180 Chassis 192 168 100 9 Management Module 211 192 168 100 10 Management Module 212 192 168 100 11 12800 360 Chassis 192 168 100 9 Management Module 227 192 168 100 10 Management...

Page 54: ...n as the master port the second port is the partner or slave port The following CLI commands can enable 8x ports ismPortSetWidth sets the supported link width for an individual IB port ismChassisSetWi...

Page 55: ...bounce 4 At the switch unplug and reinsert the cables to the physical ports After reinserting the first cable the user has four 4 seconds to reinsert the second cable associated with the 8x connectio...

Page 56: ...Installation Guide July 2015 56 Order Number G91928004US 6 From the Chassis Viewer main menu click on Port Stats then IB Port Stats to display the IB Port Statistics screen The 8X port for DUO of cabl...

Page 57: ...200 switches are shipped with all ports having a port width of 1x 4x 8x When connecting an externally managed 12200 to another switch that has 8x ports defined for example another externally managed 1...

Page 58: ...eing an 8x connection but the link is up at 4x certain tools for example the Intel FastFabric iba_report o slowlinks command may flag this connection as not being linked up at its optimum capability 2...

Page 59: ...user has four 4 seconds to reinsert the second cable associated with the 8x connection before the link begins training Note For proper 8x functionality it is required that both QSFP cables for a DUO a...

Page 60: ...es 12000 Series Hardware Installation Guide July 2015 60 Order Number G91928004US The first port of the group port 8 is shown as active and Up while the other port in the DUO port 17 is displayed as d...

Page 61: ...a warning level on the module The switch silicon temperature is at a warning level approximately 90 degrees C DC voltages on the board are slightly out of tolerance 12V Bulk 5V 3 3V and 1 8V are all m...

Page 62: ...sent No functional spines are present No functional leaves are present The chassis status LED is off when There are no functional power supplies present There are no management cards in the system AC...

Page 63: ...True Scale Fabric Switches 12000 Series Hardware July 2015 Installation Guide Order Number G91928004US 63 12000 Series Switches 2 10 2 Leaf Module Figure 57 MRL Active LED Figure 58 Leaf Module LEDs...

Page 64: ...e following conditions Off the system functioning normally Steady Amber the system requires some attention which could indicate one of the following conditions The switch temperature is at a warning l...

Page 65: ...dule The switch silicon temperature is at a warning level approximately 90 degrees C DC voltages on the board are slightly out of tolerance 12V Bulk 5V 3 3V and 1 8V are all monitored The module can n...

Page 66: ...tive state Off the physical link is down port is in the Down state 2 10 5 2 Status The status LED indicates one of the following conditions Steady Green the module is operating normally Blinking Green...

Page 67: ...tions to ensure that no damage is done to its components Blinking Amber once every four seconds LED test state 2 10 5 4 RJ45 LEDs The RJ45 connectors have two LEDs Act and 100 The 100 LED is Green whe...

Page 68: ...to commands for configuration and temperature related operations A fan is not responding to commands for temperature and speed related operations The fan speed has fallen below the minimum allowed RP...

Page 69: ...routing Other physical attributes are shown in the table below Note The 12000 series products should not be installed in two post telecommunication racks A 2 Environmental Specifications Operating te...

Page 70: ...d in each system is defined in the following table Fan Tray Hot plug with one axial brushless 12V fans per fan tray Chassis airflow Front to back Power supply airflow Front to back Note It is recommen...

Page 71: ...yed in Table 5 Power supplies are N 1 redundant and hot pluggable Note An AC power cord is required for each power supply Refer to Table 5 Table 5 System Power Attributes Model 12800 360 12800 180 128...

Page 72: ...extension cable that the equipment is plugged into The power delivery system must be set up so the power supplies do not overpower the maximum amperage of any given system For the 12800 360 and 12800...

Page 73: ...der Number G91928004US 73 12000 Series Switches Figure 64 12800 Series Power Distribution Table 6 AC Plug Types Region Country Voltage Rating Plug Type Misc Notes North America 100 127 NEMA 5 20P Nort...

Page 74: ...0 IEC 309 3 wire two phase and earth Connector size and color variations are used to indicate amperage rating This is utilized in Switzerland for 16A applications International 200 240 IEC 309 4 wire...

Page 75: ...laite Yksik ss saattaa olla useampia kuin yksi virtajohto Irrota kaikki virtajohdot ennen yksik n huoltamista niin s hk iskun vaara pienenee B 1 1 3 D claration 1 D connecter l appareil Cette unit pe...

Page 76: ...cnico en la unidad B 1 1 9 Uttalande 1 Koppla bort enhet Den h r enheten kan ha mer n en str msladd Reducera risken f r elektrisk st t genom att koppla bort alla str msladdar innan enheten underh lls...

Page 77: ...echend gen gend Leute ein Verwenden Sie wenn m glich einen mechanischen Aufzug B 1 2 5 Dichiarazione 2 Sollevamento del telaio Durante il sollevamento seguire le procedure di sicurezza NOTA utilizzare...

Page 78: ...lo fobol ll csoportot alkalmazzon a vonatkoz ir nyelvek betart sa mellett Lehetos g szerint mindig haszn ljon mechanikus emeloszerkezetet B 1 2 11 2 B 1 2 12 B 1 2 13 B 1 3 Statement 3 Energy Hazard T...

Page 79: ...B 1 3 6 Erkl ring 3 Str mfare hold fingre og hender unna str mforsyningsrom og kretskort for unng elektrisk sjokk B 1 3 7 Declara o 3 Risco de choque el ctrico Para reduzir o risco de choque el ctrico...

Page 80: ...de capots peut engendrer une exposition un rayonnement laser dangereux Ce rayonnement peut provenir des connecteurs ou des c bles en fibre optique B 1 4 4 Anweisung 4 Laserstrahlung manche optischen...

Page 81: ...ska kablar B 1 4 10 Kijelent s 4 L zersug rz s Bizonyos optikai term kek l zersug rz st bocs tanak ki A burkolatok elt vol t s val vesz lyes l zersug rz snak tehetik ki magukat Sug rz st csatlakoz k v...

Page 82: ...i circuiti Non rimuovere le coperture B 1 5 6 Erkl ring 5 Ingen deler som kan vedlikeholdes av brukeren farlig str mmengde kan finnes inni str mforsynings og kretskortmoduler Fjern ikke dekslene B 1 5...

Page 83: ...personnel qualifi est autoris installer retirer ou remplacer des ch ssis ou modules B 1 6 4 Anweisung 6 Ger teinstallation Die Installation Entfernung oder Erneuerung von Geh use und Modulen sollte n...

Page 84: ...revent exposure to energy hazards inside the unit contain EMI and maintain cooling air balance in the chassis B 1 7 1 Verklaring 7 Toevoegen of vervangen van modules deze modules zijn alleen bedoeld v...

Page 85: ...ibrio dell aria di raffreddamento nel telaio B 1 7 6 Erkl ring 7 Tillegging eller utskifting av moduler disse modulene skal kun installeres i baseenhetene p Intel 12000 serien Installer alltid tomme e...

Page 86: ...d sa vagy cser je Ezek a modulok kiz r lag Intel 12000 es sorozat b zisegys gekbe p thetoek be Akt v modul cser jekor mindig szereljen be res helyeket Ezek megakad lyozz k az egys gen bel li energiave...

Page 87: ...their own serial cables follow the guidelines below Figure 65 represents the RJ 11 connector located on the Intel 12200 and 12300 The only serial port signals required are Tx Rx and Ground All other...

Page 88: ...a list of RJ45 on Digi to RJ11 cross references The cable should connect the three RJ45 signals on the Digi to the RJ11 connector The signals for the T3 card located inside the switch and spine are in...

Page 89: ...bled to function properly After populating the management leaf slots the user may install additional leaf modules in any of the leaf slot locations Most users will generally install leaf modules in a...

Page 90: ...Installation Guide July 2015 90 Order Number G91928004US D 4 12800 360 D 4 1 Single Management Module MM slot M228 Leaf module management slot L127 D 4 2 Dual Management Modules MM slot M228 Leaf mod...

Page 91: ...ment FRU part numbers Standard chassis 12200BS01 Reversed airflow AC power inlets 12200BS02 E 1 1 1 Removal Procedures 1 Power down the switch by unplugging AC power 2 Remove all applicable IB Etherne...

Page 92: ...erial cables Set these aside for reinstalling after replacing the management card 3 Remove the switch from the rack Keep all rail hardware installed in the rack 4 Remove the management card slot cover...

Page 93: ...itches 12000 Series Hardware July 2015 Installation Guide Order Number G91928004US 93 12000 Series Switches 2 Press down on the management card to ensure that is seated properly Figure 67 12200 Manage...

Page 94: ...e Scale Fabric Switches 12000 Series Hardware Installation Guide July 2015 94 Order Number G91928004US 3 Complete the replacement by re inserting the screw as displayed in Figure 69 Figure 68 12200 Ma...

Page 95: ...ess 8 Cable all applicable IB ports E 2 Intel 12300 E 2 1 Chassis Replacement FRU part numbers Standard 36 port chassis 12300BS01 12300 18 port chassis 12300BS18 E 2 1 1 Removal Procedures 1 Power dow...

Page 96: ...ower 5 Change the switch gateway and subnet mask addresses to a new network address 6 Cable all applicable IB ports E 2 2 Fan Power Supply Replacement FRU part number 12300PS01 Note These fan power su...

Page 97: ...inger tab clicks into place E 3 Intel 12800 Series E 3 1 Fan Replacement FRU part numbers Intake Fan 12800FITK Exhaust Fan 12800FEXH E 3 1 1 Removal Procedures 1 While holding the handle push the rele...

Page 98: ...il it engages with the backplane connector 2 Make sure the fan is operating and the Status LED is green E 3 2 Power Supply Replacement FRU part number 12800PS01 Note These power supplies are to be use...

Page 99: ...supply is operating and the AC OK and DC OK LEDs are green E 3 3 Leaf Module Replacement FRU part numbers 18 Port Leaf 12800LF18 24 Port Leaf 12800LF24 E 3 3 1 Removal Procedures Note If the leaf mod...

Page 100: ...ches True Scale Fabric Switches 12000 Series Hardware Installation Guide July 2015 100 Order Number G91928004US 1 Pull each release arm down until the leaf module disengages from the backplane connect...

Page 101: ...slot until it engages with the backplane connector 2 Push the arms up until they lock in place 3 Make sure the module is operating and the Status LED is green E 3 4 Spine Module Replacement FRU part...

Page 102: ...ent Module Replacement FRU part number 12800MM01 E 3 5 1 Removal Procedures 1 Loosen the thumbscrew until it releases from the faceplate 2 Pull the release arm out until the management module disengag...

Page 103: ...n Guide Order Number G91928004US 103 12000 Series Switches Note The standard FRU replacement process for management modules is one at time This allows the master module to move to a slave state if nec...