Intel
®
Server System SR2612UR Service Guide
43
Figure 35. Position the DVD Unit
9. Slide the DVD / tray assembly back into the enclosure and anchor it using the screw
that was removed in Step 7.
10. Using the slimline cable shipped with the system, connect the power end of
slimline cable to the power cable located in the enclosure and the SATA end of
slimline cable to the CPU server board. If 2.5-inch drives are installed, connect the
SATA cable to the SATA2 connector.
Figure 36. Routing the Cable From the DVD Unit to the Server Board
11. Reinstall the top cover and tighten the captive screw.
12. Reinstall the power cord(s).
Replacing a Fan
You should replace a defective fan as soon as possible to maintain proper cooling in the
enclosure. Complete the following steps to remove and install a fan in the Intel
®
Server
System SR2612UR.
Summary of Contents for SR2612UR - Server System - 0 MB RAM
Page 14: ...xiv Intel Server System SR2612UR Service Guide ...
Page 98: ...84 Intel Server System SR2612UR Service Guide ...
Page 102: ...88 Intel Server System SR2612UR Service Guide ...
Page 104: ...90 Intel Server System SR2612UR Service Guide ...
Page 136: ...122 Intel Server System SR2612UR Service Guide ...
Page 158: ...144 Intel Server System SR2612UR Service Guide ...
Page 159: ...Intel Server System SR2612UR Service Guide 145 ...
Page 160: ...146 Intel Server System SR2612UR Service Guide ...
Page 161: ...Intel Server System SR2612UR Service Guide 147 ...
Page 162: ...148 Intel Server System SR2612UR Service Guide ...