Intel® Server System M20MYP1UR System Integration and Service Guide
15
2.1.2
System Cover Installation
Figure 2. System cover installation
1.
Place the system top cover onto the chassis and slide it towards the front of the chassis until it locks into
place (see Letter A).
Shipping note
: When transporting the server system, Intel recommends installing the three top cover screws
(See Letter B) prior to shipping.
2.2
Air Duct Removal / Installation
Always operate your server system with the air duct in place. The air duct is required for proper airflow within
the server system.
Required Tools and Supplies:
•
Anti-static wrist strap and conductive workbench pad (recommended)