background image

Warnings!

15kg

30kg

50kg

For devices ≥ 15 kg, it requires at least 2 people. 

For devices ≥ 30 kg, it requires at least 3 people. 

For devices ≥ 50 kg, it requires at least 4 people.

请保留本文档,以便于日后查阅。

Watch out for the scratches that may be caused by the cabinet, chassis or rails.
Be aware of electric shock when installing the servers into the cabinet in use.

DO NOT block the vents on the server during installation, especially the vents on

the front and rear of the server.

Remove the protective film from the chassis before installing servers into the rack.

For proper ventilation, leave a minimum space of 15 cm between two servers.

For easy access of the front and rear ports and cabling, leave a minimum space of

70 mm between the front side of the server and the inner side of the cabinet’s front
door, and 150 mm between the rear side of the server and the inner side of the
cabinet’s rear door.

Always keep the air baffles in place to ensure proper air flow and avoid air

turbulence in the server room.

Installation must comply with local and regional electrical regulations. To reduce

the risk of personal injury, fire, or damage to the server, DO NOT overload the AC
supply that provides power to the rack.

Servers can only be deployed in dedicated cabinets with ventilation holes or

specialized cooling cabinets to avoid server failure from overheating as they are
high power appliances.

In case of multiple-server deployment, always load from bottom to top and place

the heavier server on the lower bay.

DO NOT install devices beyond the cabinet’s load-bearing capacity, power supply

capacity and heat dissipation capacity.

Rack-Mounted Server

Installation Guide

   

V1.0

Reviews: