![Inovance SV820N Series Manual Download Page 27](http://html1.mh-extra.com/html/inovance/sv820n-series/sv820n-series_manual_2064769027.webp)
- 26 -
2 Installation
2
2.1.3 Installation Method
This product supports backplate mounting via three installation holes on the body and can be fixed to the
installation surface with M4 screws.
Installation method:
Mark the position of tapped holes for installation on the base plate. Drill holes for fixing the screws on the
base plate.
This product must be installed on the base plate vertically.
Below is the installation diagram:
Figure 2-5
Backplate mounting diagram
Recommended torque for installation (N.M):
When the M4 screws are used to fix the product, the torque is recommended to be 1.2 N.M.
Item
M3
M4
M5
M6
M8
M10
M12
Electric connection
0.55
1.2
2.8
6
13
25
50
Summary of Contents for SV820N Series
Page 128: ...127 6 Trial Running 6 2 The definition part of FB 3 Five function blocks in FB...
Page 143: ...142 6 Trial Running 6 3 Open Visual studio and create a New Twincat3 Project...
Page 146: ...145 6 Trial Running 6 Click OK Click OK...
Page 147: ...146 6 Trial Running 6 Click Yes Click OK...
Page 149: ...148 6 Trial Running 6 C The default RPDO list is as follows...
Page 150: ...149 6 Trial Running 6...
Page 152: ...151 6 Trial Running 6 7 Activate the configuration and switch over to the running mode Click...
Page 158: ...157 6 Trial Running 6 Create a new POU...
Page 159: ...158 6 Trial Running 6 Create a new FB add MC_power MC_jog MC_home MC_absolute MC_reset to FB...
Page 160: ...159 6 Trial Running 6 Call axis_motion in main Call the program in PLCTASK...
Page 181: ...Revision History Date Revised Version Revised Details May 2017 A00 First release...