
- 24 -
2 Installation
2
2.1.2 Requirements of the Installation Dimensions and Clearance
Product dimensions (mm)
Figure 2-2 Diagram of physical dimensions
184.0
122.0
167.0
141.0
8.5
175.0
4.3
110.0
3-M4 tapped hole
Clearance
The product can be installed side by side (with the clearance at least 2 mm) in one layer or two layers, as
shown in the figure below. When the product is installed in two layers, minimum clearance is required be
-
tween units.
Figure 2-3 Clearance between units when the product is installed in two layers
≥
50
250
≥
150
≥
50
≥
2
Summary of Contents for SV820N Series
Page 128: ...127 6 Trial Running 6 2 The definition part of FB 3 Five function blocks in FB...
Page 143: ...142 6 Trial Running 6 3 Open Visual studio and create a New Twincat3 Project...
Page 146: ...145 6 Trial Running 6 Click OK Click OK...
Page 147: ...146 6 Trial Running 6 Click Yes Click OK...
Page 149: ...148 6 Trial Running 6 C The default RPDO list is as follows...
Page 150: ...149 6 Trial Running 6...
Page 152: ...151 6 Trial Running 6 7 Activate the configuration and switch over to the running mode Click...
Page 158: ...157 6 Trial Running 6 Create a new POU...
Page 159: ...158 6 Trial Running 6 Create a new FB add MC_power MC_jog MC_home MC_absolute MC_reset to FB...
Page 160: ...159 6 Trial Running 6 Call axis_motion in main Call the program in PLCTASK...
Page 181: ...Revision History Date Revised Version Revised Details May 2017 A00 First release...