Appendix C - interface Tools DA1 - DA2

The DA1/2 Kits are designed for the following:

 

Connecting of ITL note validators to a PC to upgrade note data and firmware.

 

Testing of NV9 note validators independently of the host machine to confirm the validator is working

but the host machine may be inhibiting some of the channels.

The DA1 and DA2 Kit comprise of the following components:

DA1

DA2

DA1 adapter board (PA167)

DA2 adapter board

NV9 Adapter to Validator cable (C

USB type-A to Type-B cable

ITL Support CD-ROM for DA1

ITL Support CD-ROM for DA2

Power Cable

DA2 to NV9 cable

Installation Guide

Power Cable

Installation Guide

Connecting a DA1 to a validator and PC

If you are using Windows 95/98/NT/XP™

,

Pentium™ (© Microsoft and Intel) operating systems connect

the DA1 to the validator as shown below (see figure 1), using the 16-way to 5-way connector. The 3.5mm
jack plug and 2 banana plugs are used to supply power to the DA1. C12 volts to the red banana
plug and GND (0V) to the black plug.

Plug the 9-way D-type connector into the serial port of the PC and note of the number of the port, as this
will be needed later for configuring the software. Once the connections have been made install the
appropriate software for the validator you are using

.

Figure 1 - Connecting DA1 to a NV9 and PC for upgrading

Connecting a DA2 to a validator and PC

If you are using Windows Pentium™ (© Microsoft and Intel) 98, 98SE, 2000, XP Home or XP Professional
operating systems, connect the DA2 to the validator as shown below (see figure 2), using NV9 TO DA2
connector. The 3.5mm jack plug and 2 banana plugs are used to supply power to the DA2. C12
volts to the red banana plug and GND (0V) to the black plug.

Plug the USB type Connector into the USB port of the PC. Once the connections have been made install
the appropriate software for the validator you are using

.

Figure 2 - Connecting DA2 to a NV9 and PC for upgrading

Software Installation

To install the software to upgrade datasets and firmware, insert the CDROM into the PC drive. An
installation menu will appear, select the product that you wish to download, and select the software you
wish to use. Follow the onscreen instruction to complete the installation. Instructions for configuring and
using the software you have installed can by found in the online help for that software.

PC USB Port

Validator

+ 12V DC

Summary of Contents for GA326-3

Page 1: ...Innovative Technology Limited NV9 Bank Note Validating System The Future of Smiley Bank Note Handling Operations Manual GA326 3 Copyright Innovative Technology Limited 2005...

Page 2: ...vative Technology Ltd Title NV9 Engineers Manual Drawing No GA326 Project Author T J Crowley Date 29 10 2004 Format MS Word 2000 Issue Rel Date Mod By Comments Issue 1 29 10 2004 TJC First draft Issue...

Page 3: ...6 2 Input and Output Hardware Circuits 12 6 3 Software Optional Serial Interface Input and Outputs 12 7 MACHINE INTERFACES PROTOCOLS 13 7 1 Parallel input and output 13 7 2 Pulse Stream Output 13 7 3...

Page 4: ...4 10 ROUTINE MAINTENANCE 25 10 1 Cleaning 25 10 2 Note Path Debris Clearing Belt Changing 26 11 FAULT FINDING ANALYSIS 27 12 SUPPORT TOOLS 29 12 1 PC Currency Programming Software ITL BNV Download Man...

Page 5: ...ay continue to improve our product Alternatively visit our web site at www innovative technology co uk Innovative Technology Ltd Derker Street Oldham England OL1 4EQ Tel 44 0 161 626 9999 Fax 44 0 161...

Page 6: ...mended that for all but simple mechanical repairs the unit be returned to an approved service centre for repair Caution Never exceed the recommended environmental and electrical limits Do not attempt...

Page 7: ...ded that the power supply used can supply at least 1 5Amps 3 Environment and Power Requirements Environment Minimum Maximum Temperature 3o C 50o C Humidity 5 95 Non condensing Table 1 Environmental Re...

Page 8: ...set this may be done using either the NV9 to NV9 currency cloning system or the PC based Currency Management software New currencies and applications are being tested all the time please refer to our...

Page 9: ...Switch 1 currently has no function and is reserved for future use Switch 2 pulse multiplier This switch is used to modify the behaviour of the selected machine interface Details of the function of thi...

Page 10: ...ction of this manual 5 2 LED Status Codes The three status LED s are located to the right of the DIPswitches on the top of the unit and are used to indicate a variety of status signals The red status...

Page 11: ...rial Mode 2 Vend 2 binary bit 2 Note accepted on Channel 2 pulse output 3 Vend 3 binary bit 4 Note accepted on Channel 3 pulse output 4 Vend 4 binary bit 8 Note accepted on Channel 4 pulse output 5 In...

Page 12: ...transistors All Inputs are held high to internal 5v via 10K The input structure is a CMOS gate with anti static protection fitted Interface Logic levels Logic Low Logic High Inputs 0V Low 0 5 3 7V Hig...

Page 13: ...d low so that notes may be accepted If all four inhibits are high simultaneously then the NV9 will not read in any notes In this mode if a note is inserted the motor will run in reverse preventing the...

Page 14: ...eld high To enable a channel the corresponding inhibit must be latched low so that notes may be accepted Note Channels higher than four cannot be individually inhibited but will be globally inhibited...

Page 15: ...h will cause a note reject In the event of a note being forcibly removed from the mouth of the NV9 during the 30 second interval the NV9 will go out of service for 45 seconds Inhibit Operation Each ch...

Page 16: ...on C7 7 Inhibit C8 138 Note Accept on C8 8 Inhibit C9 139 Note Accept on C9 9 Inhibit C10 140 Note Accept on C10 10 Inhibit C11 141 Note Accept on C11 11 Inhibit C12 142 Note Accept on C12 12 Inhibit...

Page 17: ...idator Ready 121 Software Inhibit Channel 4 Inhibit C4 134 Inhibit C4 Channel 4 Inhibited 134 Software Enable Channel 4 Uninhibit C4 154 Uninhibit C4 Channel 4 Inhibited 154 Status Report 182 Status R...

Page 18: ...ts Each SSP device of a particular type has a unique serial number this number is used to validate each device in the direction of credit transfer before transactions can take place Commands are curre...

Page 19: ...Validators have a unique address 00110XXX binary 30H The VMC polls the bus to detect presence of the NV9 Validators or get information on the current status of the Validators The Validators will resp...

Page 20: ...ng the advanced option on the Currency manager program Pin out connections on NV9 for CCTalk are shown below see figure 7 looking at the connection pins on the NV9 interface connector Notes For detail...

Page 21: ...m the controller ACCEPT ENABLE and SEND and one from the Validators IRQ INTERRUPT see table 8 Caution Please note that the NV9 is required to operate on a 12volt DC power supply The NV9 ground must be...

Page 22: ...available from support Innovative technology co uk How to register for the first time log in please refer to Appendix D 8 2 NV9 NV9 Copy Cloning Overview This facility exists for a NV9 Bank Note Valid...

Page 23: ...further copy action will take place If Slave firmware version is same as Master then Master will start to copy currency data to Slave If Slave firmware version is less than master then master will sta...

Page 24: ...zel and Validator Removal 9 2 Changing or removing cash boxes The NV9 validators can also be supplied with the various cash box options see figure 11 Figure 11 Clip On and Slide in Cash Boxes 300 Note...

Page 25: ...MILD DETERGENT To clean slide the red release catch on the end of the NV9 Validator to open the note path The note path and lozenge are now exposed for cleaning Carefully wipe the surfaces with a soft...

Page 26: ...ith a soft lint free cloth that has been dampened with a water and mild detergent solution i e household washing up liquid Take particular care around all the sensor lenses see figure 12 ensuring they...

Page 27: ...e specification YES NO Check correct supply and sufficient current Check correct DIPswitch settings are selected Check Interface system Finish Notes are not stacking correctly Is cash box fitted YES N...

Page 28: ...the supply voltage level correct YES Are there foreign objects in the note path Clean the note path Check correct supply and sufficient current Check for any damage Replace damaged components Check th...

Page 29: ...new version of firmware onto the NV9 Use diagnostic functions to check Validators operation firmware version 3 15 and greater only The software will run on an IBM compatible Personal Computer with Pe...

Page 30: ...NV9 Operations Manual GA326 4 30 of 38 Copyright Innovative Technology Limited 2005 Appendix A Drawings...

Page 31: ...NV9 Operations Manual GA326 4 31 of 38 Copyright Innovative Technology Limited 2005...

Page 32: ...NV9 Operations Manual GA326 4 32 of 38 Copyright Innovative Technology Limited 2005...

Page 33: ...NV9 Operations Manual GA326 4 33 of 38 Copyright Innovative Technology Limited 2005...

Page 34: ...NV9 Operations Manual GA326 4 34 of 38 Copyright Innovative Technology Limited 2005...

Page 35: ...e note 5 The Validator issues a 100ms pulse on the appropriate channel after pin 10 going high to indicate final acceptance of the note If the signal has not been received within 30 seconds it indicat...

Page 36: ...serial port of the PC and note of the number of the port as this will be needed later for configuring the software Once the connections have been made install the appropriate software for the validato...

Page 37: ...t innovative technology co uk if you require further assistance Appendix D Website Registration Please move mouse cursor over the support button and click on Currency Downloads If you are already regi...

Page 38: ...ion we need a valid e mail adress Here you can choose a user name which you will need to log in For a job description you can select one of the listed occupations Please enter you self given password...

Reviews:

Related manuals for GA326-3