![Innovatech Teerminator-2000 Operation And Maintenance Manual Download Page 21](http://html.mh-extra.com/html/innovatech/teerminator-2000/teerminator-2000_operation-and-maintenance-manual_2063663021.webp)
21
TERMINATOR® OPERATION AND MAINTENANCE MANUAL
START OF DAY OR SHIFT
Use the following procedures to start the day or shift or to set up for a new job.
All systems are OFF and the fuel flow control is OFF. You are ready to test the Terminator® before
starting a job or moving it to a job site.
1.) Check all the fuses located in the console panel.
2.)
Check all the fuel linkages and lines for leaks that you can see, hear or smell. Turn the propane tank ON
(turn control counterclockwise)
very slowly
and listen for leaks (a hiss). If yes, turn the tank OFF, tighten
the line and test again.
Control ON: turn control counterclockwise
Control OFF: turn control clockwise
If all linkages and lines are okay, go to Step 3.
3.) Use dipsticks to check the level and clarity of the engine oil and hydraulic fluid. Add oil or fluid as
needed. If either oil is cloudy or beginning to look muddy, change it before you run the engine.
Do not
run the Terminator® on dirty or muddy oil because you can damage the engine and its parts.
Visually inspect air filter and replace if dirty.
4.) Check the blade and replace or adjust it as needed for the job.
5.) Check the tires.
6.) Inspect the machine as a whole; to be sure it is ready to run.
7.) Mount machine. Turn keyed ignition On, pause and turn starter ignition switch to start engine.
8.) When dismounting machine, turn off engine.
CLOSE OF DAY OR SHIFT
1.) Turn all switches and systems OFF.
2.) Turn the propane tank control OFF.
3.) Inspect the machine overall to make sure it is okay to run the next day or shift.
4.) For safety, remove propane tank and key.