
19P03-DOC01E REV-3
45
REPAIR PROCEDURES
Siderail assembly replacement
Tools required:
•
½” Socket
•
3/8” Drive Ratchet
•
Cutting Plier
Procedure:
1. Raise the bed to its highest position and apply the brakes.
2. Raise the backrest to the highest position (If command doesn’t respond, use the
CPR handle and raise it up manually) and raise the side rail.
3. Unplug the power cord of the bed from the wall outlet.
4. Remove MJB locking bracket and unplug the wire related to the side rail under
bed.
5. With a cutting plier, remove the tie wrap of the side rail’s wire related to the bed.
6. With a 3/8” drive ratchet and a ½” socket, remove the four (4) bolts (A) fixing the
siderail to the structure of the platform. Make sure to hold the side rail while
removing the bolts, preventing the side rail from falling to the ground.
7. Reverse the above steps to install the new siderail assembly.
8. Test the siderail movement before returning the bed to service.
MJB LOCKING
BRACKET