Omni Installation Instructions
Page 82
© Mass Electronics Pty Ltd 2017
Edition 1.2 dated 20.08.2018
Figure 5-6:
End of Line Jumper, Typical Location
COMMS
COMMS
COMMS
COMMS
COMMS
COMMS
COMMS
COMMS
U10 REMs are daisy
chained for connection
via the RS-485 Comms.
COMMS
COMMS
U10 REM final connection.
Remember to set the End Of
Line (EOL) jumper on the first
and last device on the RS-485
network.
C40
Place the jumper on
to set End of Line.
EOL Note:
In this example, the C40 and the
last REM require EOL jumpers
to be set.
COMMS
COMMS
COMMS
COMMS
5-1.5 Check EOL Jumpers
The End-of-Line (EOL) jumpers are required for RS-485 connected devices. There are certain rules
that must be followed for proper installation of End-of-Line jumpers.
If only one cable is connected into an RS485 Comms connector on an Omni U10 REM, you must place
the EOL jumper on that device.
If two cables are connected to the same RS485 Comms connector, the jumper should NOT be
installed.
All controllers along the RS485 Comms on a sub system network should be carefully checked to verify
that the EOL jumpers are installed only on the first and last device in the network.
Figure 5-7:
IG01 and Sub-Network EOL Placement
C40
Place the jumper on
to set End of Line.
EOL Note:
In this example, the IG01 and VAVMax
require EOL jumpers to be set.
Comms Note:
The IG01 is connected to two comms channels,
Innotech Net Comms and Innotech Global Comms.
Using two ports allows for data sharing.
To/From Network
IG01
MicroMAX
VAVMax
Innotech Subnet Comms
Comms 1
Innotech Net Comms
Comms 2
Innotech Global Comms
Comms 1
Comms 2
Summary of Contents for Omni C14
Page 1: ...Omni INSTALLATION INSTRUCTIONS...
Page 11: ...Omni INSTALLATION INSTRUCTIONS Preliminary Information 1...
Page 17: ...Omni INSTALLATION INSTRUCTIONS Mechanical Installation 2...
Page 31: ...Omni INSTALLATION INSTRUCTIONS Electrical Installation 3...
Page 53: ...Omni INSTALLATION INSTRUCTIONS Networking 4...
Page 74: ...Omni INSTALLATION INSTRUCTIONS Commissioning 5...