19
EN
SANDWICH-10/-11 / Version 181219 / www.innotech.at
16
COPY TEMPLATE
ACCEPTANCE LOG
ORDER NUMBER:
PROJECT:
CLIENT:
Specialist:
Company address:
CONTRACTOR:
Specialist:
Company address:
INSTALLATION:
(
please tick as appropriate)
EAP
(single anchor points)
ANCHORAGE POINTS
of a horizontal lifeline system as per EN 795:2012 TYPE C
Specialist:
Company address:
OPTIONAL: when setting up a horizontal lifeline system in accordance with EN
795:2012 TYPE C
Installation of the anchorage points by:
Installation of the lifeline system by:
ACCEPTANCE LOG NO.
____
(PART 1/2)
SANDWICH-10/-11