14
SANDWICH-10/-11 / Version 181219 / www.innotech.at
EN
12
INSTALLATION
1.
RISK TO LIFE if NOT correctly installed.
-
Install INNOTECH-SANDWICH-10/-11 in accordance with the user instruc-
tions.
-
Maintain a min. edge distance of 1.50 m to the end of the roof sheeting
(Figure).
-
The maximum spacing of the intermediate cable brackets is 7.5 m.
!
DANGER
2.
1.5 m
1.5 m
EAP
AIO
2x
2x