background image

INSTALLATION

OPERATION

1.  Always  press  the  handle  down  before  turning  the  handle  to  the  desired 

position viz. Service, Backwash or Rinse.

2.  If the line pressure is more , It is advisable to close the Inlet Valve   before 

turning handle.

SPECIFICATIONS

Inlet/Outlet/Drain connec ons   

1” BSP

Valve threading for Vessel Moun ng             

2.5" NPSM

Flow Rate 

5m³/hr @0.35kg/ cm² 

Max. Opera ng Pressure 

5kg/ cm²

1.
2.
3.
4.

:
:
:
:

GENERAL ASSEMBLY

MULTIPORT VALVE  F0525FF

SCOPE OF SUPPLY

1.Mul port valve

3.O & M Manual

2.Top and Bo om Distributors

Take a 25 NB Rigid PVC riser pipe, longer than  the height of the vessel and 
solvent cement the bo om distributor to one end of the pipe.

Insert this riser pipe into the vessel and cut the pipe from the top ensuring 
that  the  height  of  the  pipe(with  the  distributor  touching  the  bo om)  is 
42mm more than the top of the vessel.

Pour gravel and then filter media into the vessel. Cover the mouth of the riser 
pipe while doing this so that media doesn't enter the pipe. Align the riser 
pipe so that it is in the centre of the vessel opening.

Screw on the top distributor to bo om of the MPV.

Screw on the MPV to the vessel  ensuring that the riser pipe goes through the 
top distributor into the MPV.

Make the inlet, Outlet and Drain connec ons.

1

2

3

4

5

6

Sr. No. 273, Near Vitthal Mandir, Bhatewara Nagar,
Hinjawadi, Pune - 411 057, Maharashtra (India)
Tel.:+91 20 2293 2122, +91 20 2293 2123
E-MAIL:[email protected]
              www.initiativeengineering.com

FRONT VIEW

294

DRAIN

INLET

147

20

29

113

29

89

SIDE VIEW

1

18

25

142

164

240