ABK2027IQE01_A - Installation and Operation Manual
7. Installing the unit
Before installing the unit, you must remove the packaging, taking special care not to damage the housing.
Check that there is no moisture inside the packaging. If there are signs of moisture, you must not install the unit
until you are sure it is completely dry.
CAUTION
All installation operations must comply with current regulations.
Before carrying out the installation, take into account the instructions in section
“6. Preparation for installing
.
7.1. Fixing the unit to the floor
To fasten the inverter, bolt a series of bolts to the ground via the dedicated holes on the lower base.
Follow these steps:
1. Mark the fixing points on the floor.
2. Drill the ground with a proper bit.
3. Bolt through the base's holes.
4. Check that the unit properly secured.
7.2. Opening the ventilation system protections
CAUTION
The ventilation system protection must remain open whenever the unit is running. Failing to do this may cause
faults.
Ingeteam accepts no liability for the consequences of non-compliance with this warning.
Before starting the connections, the ventilation system protections must be opened. To do this, take the following
steps:
57
Installing the unit
Ingeteam
Summary of Contents for INGECON SUN 1000TL U B360
Page 1: ...INGECON SUN PowerMax TL U B 1000 Vdc Installation and Operation Manual...
Page 22: ...ABK2027IQE01_A Installation and Operation Manual DC supply 22 Unit description Ingeteam...
Page 176: ...Notes...
Page 177: ...Notes...
Page 178: ...Notes...
Page 180: ...ABK2027IQE01_A 05 2019 Ingeteam Power Technology S A www ingeteam com...