49
Maintenance Inspection Schedule
A closely followed maintenance program will help to keep
your Thermo King unit in top operating condition. The
following general schedule is provided to assist in monitoring
that maintenance.
For more specific detail, see the maintenance manual for your
unit and to the PreTrip Inspection chapter in this manual.
After first week of operation:
•
Check belt tension.
•
Tighten unit mounting bolts.
•
Check refrigerant level.
49
Maintenance Inspection Schedule
A closely followed maintenance program will help to keep
your Thermo King unit in top operating condition. The
following general schedule is provided to assist in monitoring
that maintenance.
For more specific detail, see the maintenance manual for your
unit and to the PreTrip Inspection chapter in this manual.
After first week of operation:
•
Check belt tension.
•
Tighten unit mounting bolts.
•
Check refrigerant level.
Summary of Contents for Thermo King V-520 10
Page 2: ......
Page 4: ...2 2...
Page 6: ...Introduction 4 Introduction 4...
Page 14: ...Safety Precautions 14 Safety Precautions 14...
Page 40: ...Unit Operation 40 Unit Operation 40...
Page 48: ...Specifications 48 Specifications 48...
Page 52: ...Maintenance Inspection Schedule 52 Maintenance Inspection Schedule 52...
Page 58: ...Loading and Enroute Inspections 58 Loading and Enroute Inspections 58...
Page 60: ...Serial Number Locations 60 Serial Number Locations 60...
Page 62: ...Warranty 62 Warranty 62...
Page 72: ...72 72...
Page 73: ......