![Ingersoll-Rand Thermo King TracKing Installation Manual Download Page 36](http://html1.mh-extra.com/html/ingersoll-rand/thermo-king-tracking/thermo-king-tracking_installation-manual_2059658036.webp)
34
Super II Units Step 2 - Antenna Installation
These procedures are for Super II series units
with ThermoGuard Controller & DAS (non-SR2)
using the Razor module.
Antenna Installation and Cable Routing
1. Open all unit doors and access panels.
2. Mount the antenna to the antenna bracket with the provided washer and
nut and tighten securely. The antenna is non-directional and can be
mounted in any direction.
3. Attach the antenna bracket to the front corner grille mount with the
existing hardware.
4. Route the antenna harness down into the condenser and behind the
expansion tank. Route the harness next to the sensor harness and into
the control box, secure with bandwraps as required.
Summary of Contents for Thermo King TracKing
Page 2: ......
Page 4: ...2 TracKing Cellular Release History Released 07 15...
Page 13: ...11 Precedent Units Step 2 Antenna and Battery Installation...
Page 15: ...13 Precedent Units Step 3 REB Installation...
Page 17: ...15 Precedent Units Step 4 Door Switch Option...
Page 19: ...17 Precedent Units Step 5 Fuel Level Option...
Page 23: ...21 SB Units Step 1 Datalogger Configuration Procedures Text Header...
Page 27: ...25 SB Units Step 3 REB and Battery Installation...
Page 29: ...27 SB Units Step 3a REB and Battery Installation SR2 to SR3...
Page 31: ...29 SB Units Step 3b Units with SR2 or SR3 w Razor...
Page 33: ...31 SB Units Step 3c For Units with ThermoGuard non SR2...
Page 35: ...33 Super II Units Step 1 Datalogger Configuration Procedures Text Header...
Page 37: ...35 Super II Units Step 2 Antenna Installation...
Page 39: ...37 Super II Units Step 3 TracKing Installation...
Page 44: ...42 BLANK PAGE...
Page 46: ......