
30
SB Units Step 3c - Units with ThermoGuard (non SR2)
These procedures are for SB-30 series units
with ThermoGuard Controller & DAS using
Razor module.
TracKing Module Installation
1. Open the control box door and position the TracKing mounting plate
over the DAS location, mark and drill four #8 holes into the door and
attach the bracket. The bracket must be used with or without the DAS.
2. Connect the two antenna cables to the TracKing module.
3. From TracKing harness connect:
•
Two harness connectors to TracKing module.
•
uP-VI units without DAS - Attach both ground (GND) wires to
the control box ground stud.
•
Units with DAS - Attach (GND) wire with terminal onto the
control box ground stud. Splice the second ground wire to the
COM3 wire position (socket C).
•
Solder the Control Power (8) wire to the #8 wire terminal on the
On/Off switch.
•
Attach the Power Wire (2S) with fuse to the #2 terminal on the
relay board.
4. uP-VI units with or without DAS - use an Amp terminal remover tool
(204-737) to remove the two wires from the Communication harness
(see table) and replace them with TXA and RXA wires with the
provided terminals, tape off the removed wires. If DAS is available,
attach the TXB and RXB wires as described next, otherwise tape off
the TXB and RXB wires from the TracKing harness.
5. Units with DAS - Attach the TXB and RXB wires to the printer port
connection per the illustration. Splice TXB to the RXD3 wire (socket
a). Splice RXB to the TXD3 wire (socket B). Tape off the RXB and
TXB wires if only connected to DAS.pwith the provided terminals,
tape off the removed wires. If DAS is available, attach the TXB and
RXB wires as described next, otherwise tape off the TXB and RXB
wires from the TracKing harness.
6. Configure to REMC NO in super guarded access command.
7. uP-VI units without DAS - tape off the Xwake wire.
Units with DAS - locate the DAS 35-pin connector, remove it from the
DAS module and dissemble as shown. Add a terminal to the Xwake
wire and insert it into the DAS connector position 28. If there is a wire
present, splice Xwake wire with this wire. Reassemble the connector.
8. Secure excess wires inside control box with bandwraps.
Power Cycle and Setup Procedures
1. Reconnect the negative battery cable:
•
Turn on the unit
•
Disconnect and reconnect the 7-pin connector - this will perform a
power cycle of the GPRS module.
TracKing Verification Procedures
See “TracKing Verification Procedures” on page 38.
TracKing
Comm. Port
Pin No.
Location
RXA
TXD3
11
Port 3
TXA
RXD3
14
Port 3
Summary of Contents for Thermo King TracKing
Page 2: ......
Page 4: ...2 TracKing Cellular Release History Released 07 15...
Page 13: ...11 Precedent Units Step 2 Antenna and Battery Installation...
Page 15: ...13 Precedent Units Step 3 REB Installation...
Page 17: ...15 Precedent Units Step 4 Door Switch Option...
Page 19: ...17 Precedent Units Step 5 Fuel Level Option...
Page 23: ...21 SB Units Step 1 Datalogger Configuration Procedures Text Header...
Page 27: ...25 SB Units Step 3 REB and Battery Installation...
Page 29: ...27 SB Units Step 3a REB and Battery Installation SR2 to SR3...
Page 31: ...29 SB Units Step 3b Units with SR2 or SR3 w Razor...
Page 33: ...31 SB Units Step 3c For Units with ThermoGuard non SR2...
Page 35: ...33 Super II Units Step 1 Datalogger Configuration Procedures Text Header...
Page 37: ...35 Super II Units Step 2 Antenna Installation...
Page 39: ...37 Super II Units Step 3 TracKing Installation...
Page 44: ...42 BLANK PAGE...
Page 46: ......