
13
GT-400 Terminal User’s Guide
Terminal Installation: Wall Preparation
Wall Preparation
These directions and provided hardware are for installation on a hollow wall only. For installation
on a solid wall, other means should be used.
1
Measure and mark a point 49 inches
(124.5 cm) from the surface of the
finished floor.
This point is used by the leveling
hole where the top-center point of
the terminal should be mounted.
At 49 inches, the unit’s platen will
be 40 inches from the floor.
2
Drive a small nail into the wall at the
mark.
For a solid wall, pre-drill a 1/8” hole.
Insert nail into the hole.
Figure 3.4— Measurements for Terminal Installation
Finished Floor
49 inches
(124.5 cm)
Leveling
Hole
Figure 3.5— Leveling the Terminal, Step One
Summary of Contents for Schlage AMGtime G Series
Page 1: ...GT 400 Terminal User s Guide...
Page 8: ...Table of Contents vi GT 400 Terminal User s Guide...
Page 14: ...Introduction Using This Guide 6 GT 400 Terminal User s Guide...
Page 50: ...Basic Operations Rebooting the Terminal 42 GT 400 Terminal User s Guide...
Page 114: ...Tips and Tricks 106 GT 400 Terminal User s Guide...