85
9.0 WATER QUALITY
RECOMMENDATIONS
Water quality is often overlooked when the cooling
system of a water cooled air compressor is examined.
Water quality determines how effective the heat transfer
rate, as well as the flow rate will remain during the
operation life of the unit. It should be noted that the
quality of water used in any cooling system does not
remain constant during the operation of the system. The
water makeup is affected by evaporation, corrosion,
chemical and temperature changes, aeration, scale, and
biological formations. Most problems in a cooling system
show up first in a reduction in the heat transfer rate, then
in a reduced flow rate, and finally with damage to the
system.
There are many constituents in the water system that
must be balanced to have a good stable system. The
following is a list of the major components that should be
monitored:
SCALE
Scale formation inhibits effective heat transfer, yet it does
help prevent corrosion. Therefore, a thin uniform coating
of calcium carbonate is desired on the inner surfaces.
Perhaps the largest contributor to scale formation is the
precipitation of calcium carbonate out of the water. This is
dependent on temperature and pH. The higher the pH
value the greater the chance of scale formation. Scale
can be controlled with water treatment.
CORROSION
In contrast to scale formation is the problem of corrosion.
Chlorides cause problems because of their size and
conductivity. Low pH levels promote corrosion, as well as
high levels of dissolved oxygen.
FOULING
Biological and organic substances (slime) can also cause
problems, but in elevated temperature environments such
as cooling processes, they are not major concerns. If
they create problems with clogging, commercial shock
treatments are available.
To ensure good operation life and performance of the
compressor cooling system, the recommended
acceptable ranges for different water constituents are
included below:
PARAMETER
Corrosivity (hardness,
pH, total dissolved solids,
temperature at inlet,
alkalinity)
Iron
Sulfate
Chloride
Nitrate
Silica
Dissolved oxygen
Oil and grease
Ammonia
CONCENTRATION
Langelier Index
0 to 1
< 2 ppm
< 50 ppm
< 50 ppm
< 2 ppm
< 100 ppm
0 ppm
(as low as possible)
< 5 ppm
< 1 ppm
FREQUENCY OF ANALYSIS
Monthly
(if stable for 3 to 4 months,
analyze quarterly)
Monthly
Monthly
Monthly
Monthly
Monthly
Daily
(if stable, analyze weekly)
Monthly
Monthly
Summary of Contents for 100-200
Page 17: ...FIGURE 2 5 1 TYPICAL OUTDOOR SHELTERED INSTALLATION 15...
Page 18: ...16 3 0 INTELLISYS INTELLISYS CONTROLLER INGERSOLLrAND INTELLISYS...
Page 52: ...50 54418074 REV B 8 0 REFERENCE DRAWINGS 8 1 ELECTRICAL SCHEMATIC STAR DELTA...
Page 53: ...51...
Page 54: ...52 54622865 REV B 8 2 FOUNDATION PLAN 125 150 HP 90 110KW AIRCOOLED SINGLE STAGE CONTINUED...
Page 55: ...53 54622865 REV B 8 2 FOUNDATION PLAN 125 150 HP 90 110 KW AIRCOOLED SINGLE STAGE...
Page 56: ...8 3 FOUNDATION PLAN 200 HP 132 160 KW AIRCOOLED SINGLE STAGE CONTINUED 54622931 REV B 54...
Page 57: ...8 3 FOUNDATION PLAN 200 HP 132 160 KW AIRCOOLED SINGLE STAGE 54622931 REV B 55...
Page 58: ...56 8 4 FOUNDATION PLAN 125 150 HP 90 110 KW WATERCOOLED SINGLE STAGE CONTINUED 39925300 REV C...
Page 59: ...57 8 4 FOUNDATION PLAN 125 150 HP 90 110 KW WATERCOOLED SINGLE STAGE 39925300 REV C...
Page 60: ...58 8 5 FOUNDATION PLAN 200 HP 132 160 KW WATERCOOLED SINGLE STAGE CONTINUED 39926191 REV C...
Page 61: ...59 8 5 FOUNDATION PLAN 200 HP 132 160 KW WATERCOOLED SINGLE STAGE 39926191 REV C...
Page 62: ...60 8 6 FOUNDATION PLAN AIRCOOLED CONTINUED 100 150 HP 75 110 KW TWO STAGE 54622980 REV B...
Page 63: ...61 54622980 REV B 8 6 FOUNDATION PLAN AIRCOOLED 100 150 HP 75 110 KW TWO STAGE...
Page 64: ...62 8 7 FOUNDATION PLAN AIRCOOLED CONTINUED 200 HP 132 160 KW TWO STAGE 54623053 REV B...
Page 65: ...63 54623053 REV B 8 7 FOUNDATION PLAN AIRCOOLED 200 HP 132 160 KW TWO STAGE...
Page 66: ...64 8 8 FOUNDATION PLAN WATERCOOLED CONTINUED 100 150 HP 75 110 KW TWO STAGE 39925326 REV C...
Page 67: ...65 8 8 FOUNDATION PLAN WATERCOOLED 100 150 HP 75 110 KW TWO STAGE 39925326 REV C...
Page 68: ...66 8 9 FOUNDATION PLAN WATERCOOLED CONTINUED 200 HP 132 160 KW TWO STAGE 39926340 REV C...
Page 69: ...67 8 9 FOUNDATION PLAN WATERCOOLED 200 HP 132 160 KW TWO STAGE 39926340 REV C...
Page 70: ...68 8 10 FLOW SCHEMATIC AIRCOOLED SINGLE STAGE 54579081 REV A...
Page 71: ...69...
Page 72: ...70 8 11 FLOW SCHEMATIC WATERCOOLED 90 F 32 C SINGLE STAGE 54579503 REV A...
Page 73: ...71...
Page 74: ...72 8 12 FLOW SCHEMATIC WATERCOOLED 115 F 46 SINGLE STAGE 54579511 REV A...
Page 75: ...73...
Page 76: ...74 8 13 FLOW SCHEMATIC AIR COOLED TWO STAGE 54579644 REV A...
Page 77: ...75...
Page 78: ...76 8 14 FLOW SCHEMATIC WATERCOOLED 90 F 32 C TWO STAGE 54579693 REV A...
Page 79: ...77...
Page 80: ...78 8 15 FLOW SCHEMATIC WATERCOOLED 115 F 46 C TWO STAGE 54579727 REV A...
Page 81: ...79...
Page 82: ...80 8 16 TYPICAL SYSTEM FLOW DIAGRAMS TYPICAL SYSTEM FLOW DIAGRAM...
Page 83: ...81 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Page 84: ...82 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Page 85: ...83 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Page 86: ...84 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Page 90: ...88 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY 10 0 MAINTENANCE RECORD...
Page 91: ...89 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD...
Page 92: ...90 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD...
Page 93: ...91 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD...