32
4.6 COOLANT (Continued)
After the unit is drained and a new coolant filter element
is installed, refill the system with fresh coolant. Bring the
receiver level of coolant up to the midpoint of the sight
glass. Replace the fill cap. Start the compressor and run
it for a short time. The correct coolant level is at the
midpoint of the sight glass with the unit running in the
‘UNLOADED” mode.
4.7 SEPARATOR TANK
SCAVENGE SCREEN/ORIFICE
TOOLS REQUIRED
■
Open end wrench
■
Pliers
PROCEDURE
The screen/orifice assemblies are similar in appearance
to a straight tubing connector and will be located
between two pieces of 1/4 inch O.D. scavenge line
tubing.
The main body is made from 1/2 inch hexagon shaped
steel and the diameter of the orifice and a direction-of-
flow arrow is stamped in flat areas of the hexagon.
A removable screen and orifice is located in the exit end
of the assembly (See Figure 4.7-1) and will require
cleaning as outlined in the Maintenance Schedule,
Section 4.1.
To remove the screen/orifice, disconnect the scavenge
line tubing from each end. Hold the center section firmly
and use a pair of pliers to gently grasp the exit end of the
assembly that seals against the scavenge line tubing.
Pull the end out of the center section while using care to
prevent damage to the screen or sealing surfaces.
Clean and inspect all parts prior to reinstallation.
When the assembly is installed, confirm the direction of
flow to be correct. Observe the small arrow stamped in
the center section and ensure the direction flow to be
from the separator tank to the airend.
FIGURE 4.7-1 SEPARATOR TANK SCAVENGE
SCREEN/ORIFICE
Summary of Contents for 100-200
Page 17: ...FIGURE 2 5 1 TYPICAL OUTDOOR SHELTERED INSTALLATION 15...
Page 18: ...16 3 0 INTELLISYS INTELLISYS CONTROLLER INGERSOLLrAND INTELLISYS...
Page 52: ...50 54418074 REV B 8 0 REFERENCE DRAWINGS 8 1 ELECTRICAL SCHEMATIC STAR DELTA...
Page 53: ...51...
Page 54: ...52 54622865 REV B 8 2 FOUNDATION PLAN 125 150 HP 90 110KW AIRCOOLED SINGLE STAGE CONTINUED...
Page 55: ...53 54622865 REV B 8 2 FOUNDATION PLAN 125 150 HP 90 110 KW AIRCOOLED SINGLE STAGE...
Page 56: ...8 3 FOUNDATION PLAN 200 HP 132 160 KW AIRCOOLED SINGLE STAGE CONTINUED 54622931 REV B 54...
Page 57: ...8 3 FOUNDATION PLAN 200 HP 132 160 KW AIRCOOLED SINGLE STAGE 54622931 REV B 55...
Page 58: ...56 8 4 FOUNDATION PLAN 125 150 HP 90 110 KW WATERCOOLED SINGLE STAGE CONTINUED 39925300 REV C...
Page 59: ...57 8 4 FOUNDATION PLAN 125 150 HP 90 110 KW WATERCOOLED SINGLE STAGE 39925300 REV C...
Page 60: ...58 8 5 FOUNDATION PLAN 200 HP 132 160 KW WATERCOOLED SINGLE STAGE CONTINUED 39926191 REV C...
Page 61: ...59 8 5 FOUNDATION PLAN 200 HP 132 160 KW WATERCOOLED SINGLE STAGE 39926191 REV C...
Page 62: ...60 8 6 FOUNDATION PLAN AIRCOOLED CONTINUED 100 150 HP 75 110 KW TWO STAGE 54622980 REV B...
Page 63: ...61 54622980 REV B 8 6 FOUNDATION PLAN AIRCOOLED 100 150 HP 75 110 KW TWO STAGE...
Page 64: ...62 8 7 FOUNDATION PLAN AIRCOOLED CONTINUED 200 HP 132 160 KW TWO STAGE 54623053 REV B...
Page 65: ...63 54623053 REV B 8 7 FOUNDATION PLAN AIRCOOLED 200 HP 132 160 KW TWO STAGE...
Page 66: ...64 8 8 FOUNDATION PLAN WATERCOOLED CONTINUED 100 150 HP 75 110 KW TWO STAGE 39925326 REV C...
Page 67: ...65 8 8 FOUNDATION PLAN WATERCOOLED 100 150 HP 75 110 KW TWO STAGE 39925326 REV C...
Page 68: ...66 8 9 FOUNDATION PLAN WATERCOOLED CONTINUED 200 HP 132 160 KW TWO STAGE 39926340 REV C...
Page 69: ...67 8 9 FOUNDATION PLAN WATERCOOLED 200 HP 132 160 KW TWO STAGE 39926340 REV C...
Page 70: ...68 8 10 FLOW SCHEMATIC AIRCOOLED SINGLE STAGE 54579081 REV A...
Page 71: ...69...
Page 72: ...70 8 11 FLOW SCHEMATIC WATERCOOLED 90 F 32 C SINGLE STAGE 54579503 REV A...
Page 73: ...71...
Page 74: ...72 8 12 FLOW SCHEMATIC WATERCOOLED 115 F 46 SINGLE STAGE 54579511 REV A...
Page 75: ...73...
Page 76: ...74 8 13 FLOW SCHEMATIC AIR COOLED TWO STAGE 54579644 REV A...
Page 77: ...75...
Page 78: ...76 8 14 FLOW SCHEMATIC WATERCOOLED 90 F 32 C TWO STAGE 54579693 REV A...
Page 79: ...77...
Page 80: ...78 8 15 FLOW SCHEMATIC WATERCOOLED 115 F 46 C TWO STAGE 54579727 REV A...
Page 81: ...79...
Page 82: ...80 8 16 TYPICAL SYSTEM FLOW DIAGRAMS TYPICAL SYSTEM FLOW DIAGRAM...
Page 83: ...81 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Page 84: ...82 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Page 85: ...83 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Page 86: ...84 8 16 TYPICAL SYSTEM FLOW DIAGRAMS...
Page 90: ...88 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY 10 0 MAINTENANCE RECORD...
Page 91: ...89 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD...
Page 92: ...90 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD...
Page 93: ...91 DATE RUN TIME WORK DONE QTY UNIT WORK HOURS MEASURE BY MAINTENANCE RECORD...