EonStor DS S48 Series Hardware Manual
2.4.1
Adjuster Pillar Installation
The adjuster pillars (R-right / L-left) are secured at the 2U / 3U position on the rack
post (indicated by the blue circles). M5 cage nuts (indicated by the blue arrows) are
inserted for securing the RAID system in-place.
4U
3U
2U
1U
34