EonStor DS S48 Series Hardware Manual
3.7.4
LCD Screen
When powering on the RAID system, wait for the front panel LCD screen to show
“
READY
” or “
No Host LUN.
”
The LCD screen startup sequence is shown and described in the sequence below:
Initializing…
Please Wait...
This screen appears when the PSUs are
turned on.
Power On Self Test Please
Wait…
System is performing a self test.
Power on
Init Completed..
System power-on self test is completed.
DS S48x-Rxxxx
System is accessing various interfaces.
DS S48x-xxxx
xGB RAM, Wait...
Verifying installed DRAM.
DS S48x-Rxxxx
System is ready. You can now start to
configure the system.
DS S48x-Rxxxxx
Ready
System is ready for I/Os.
75