EonStor / EonStor DS S12/S16/S24 Series
103
Installing the RAID Controller
After completing the battery backup unit and flash backup module installation, the
RAID controller can be re-inserted into the enclosure:
1. Insert the controller slowly into the module slot. When you feel the contact
resistance, use slightly more force and then push both of the ejection levers
upwards (indicated by the
blue arrows
) to secure the controller into chassis.
2. Secure the controller by fastening the two retention screws under the
ejection levers.
NOTE
Installation of the CBM on the controller should occur
BEFORE
rack-mounting.
A new or replaced BBU takes at least 12 hours to charge to its full capacity.
Follow the procedures shown in
Replacing the Controller Module
to replace a faulty
BBU with a new one in order to maintain fault-tolerant features.
67