Ecotron - Incubation Shaker
Installation
03 May 2018
Page
45
of
90
To stack two units, proceed as follows:
Procedure
1.
Remove the four cover caps (1) on the top of the bottom unit
from the threaded holes.
2.
Screw the four hexagonal socket head screws (3) with one
spring washer (4), disc (5) and centring sleeve (6) each into
the threaded holes.
3.
Place the insulation mat (2) of the top unit onto the bottom
unit.
4.
With another person, then lift the equipment on the handles on
the left and right side of the casing and place it flush on the
bottom unit.
The centring sleeves autonomously glide into the correspond-
ing recesses in the frame of the upper unit.
INFORMATION
When operating stacked equipment, the maximum permissible
rotation speeds are limited. For information on this subject, see
chapter 12.4.1 "Maximum Permissible Setpoints for the Rotation
Speed", page 85.
If vibrations occur during operation, reduce the shaker speed or,
alternatively, increase or decrease the load until the equipment
runs smoothly.