
INFICON
Operation | 6
UL6000-Fab-Operating-instructions-iina75en1-04-(2109)
89 / 146
6.11.1 Switch back to the internal monitor
NOTICE
Disconnect external monitor
► If the device is turned on, switch to the internal monitor in the menu before
disconnecting the connections of an external monitor.
When the instrument is switched on, you will be able to switch to internal monitor at
any time.
1
> Display > Switch monitor
2
Press the "Internal Monitor" button.
6.12 View vacuum diagram
To check the function and the operating state of the measuring system at a glance,
call up the simplified diagram of the vacuum diagram.
►
> Vacuum diagram
6
4
2
3
7
8
10
9
1
V15
V13
V12
V11
V10
V9
V8
V7
V5
V4c
V2b
V2a
p4
p2
V14
p3
p1
MS
TL
5
Fig. 13: The most important components of the vacuum diagram in UL6000 devices
1 Turbo molecular pump 2
(Booster TMP)
6 Mass spectrometer
2 Inlet flange
7 Turbo molecular pump 1
3 p1 … p4: Pressure measuring
points
8 Pressure measuring point for flow
monitoring
Summary of Contents for 550-520
Page 2: ...INFICON GmbH Bonner Strasse 498 50968 Cologne Germany ...
Page 119: ...INFICON Decommissioning 9 UL6000 Fab Operating instructions iina75en1 04 2109 119 146 ...
Page 140: ...11 Appendix INFICON 140 146 UL6000 Fab Operating instructions iina75en1 04 2109 11 3 RoHS ...
Page 144: ...Index INFICON 144 146 UL6000 Fab Operating instructions iina75en1 04 2109 ...
Page 145: ......
Page 146: ......