42
• DOK-DIAX01-TDA********-PRJ1-EN-E1,44 • 07.97
9. Commissioning
guidelines
The commissioning procedure is the same for all modular main spindle
controllers (KDA 3.2, TDA 1). Because of this fact and due to the
extensive scope of functions, it is only described once in the documen-
tation "AC main spindle drives with controlled asynchronous motors or
frameless spindle motors; Applications Manual" (No. 209-0041-4109)
which is valid for all INDRAMAT main spindle drives.
9. Commissioning guidelines