
- Checking the window pane
Orientation
If the window pane shows damage in the form of cracks or severe deterioration, it
must be replaced regardless of the information on the safety label. Initiate follow-up
activities such as ordering and schedule the replacement with the customer.
Requirement
Example: Window pane label 2006
1
Year of manufacture
2
Protection class and EN standard
3
Manufacturer
4
INDEX part number
Check the inspection label: year of manufacture, resistance class,
manufacturer (logo) of the window pane, INDEX part no.
Procedure
1.
Danger
Workpieces forcefully expelled from the workpiece
clamping device or chips resulting from cutting operation
are not held back by the destroyed pane.
Injury to the operating personnel, property damage, and
damage to the machine.
Continuous checking of the window pane and timely
replacement – see the customer’s service, inspection and
maintenance schedules/logs.
Check window pane for damage.
2. Check tightness of sliding door with window pane. Check all the seals for
damage/wear.
3. Check safety label and note replacement date.
4. Log any damage and order a new window pane, and schedule replacement
with the customer.
Maintenance Summary - 2.000 Operating hours
61
Maintenance Instructions
MS32-6.2
DIM012EN - 03.06.2020
Summary of Contents for MS16-6
Page 10: ...Preface 6 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 50: ...Maintenance Summary Care activities 46 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 76: ...Maintenance Summary 5 Years 72 Maintenance Instructions MS32 6 2 DIM012EN 03 06 2020 ...
Page 81: ......