
Maintenance Summary - 2.000 Operating hours
It is recommended to document the maintenance activities carried out by using the appropriate
maintenance log. The maintenance log has the document number DIE148EN - 17.08.2022.
- Check maintenance logs of servicing activities
- Clean and check wipers of the work area door
- Check work area door (with electr. drive) and window pane
- Check and lubricate HSK clamping set (from Ott-Jakob)
- Check tool clamping sets of the milling spindles
- Check and potentially replace the cooling lubricant adapter (HSK tool mountings)
- Check telescopic covers and wipers
- Check outer wipers of linear guides
- Check all electrical connections and drive belts of the drive motors
- Check slat/shingle cover on the telescopes (visual inspection)
- Replace filter on air conditioner cooling fan
- Check cooling unit for cooling lubricant
- Check coolant
- Clean labyrinth rings of spindles
- Check backup data carrier
- Check control cabinet
- Check cable and hose clamps for tight seating
- Replace hydraulic fluid filters
- Wassermann tool change system
- Maintenance of turret steady rest SR2 or SLU X1 (by SMW)
Maintenance Summary - 2.000 Operating hours
50
Maintenance Instructions
G300.2 G320.2 G400.2 G420 G500.2 G520
DIE147EN - 17.08.2022