background image

ch

a

tp

o

d 185

IMP

A

CT A

COUS

TIC A

G, Bodenho

f 4, 6014 Lucerne

, Switz

erland, 180620

 

20min

ASSEMBLY 
INSTRUCTIONS

chatpod 185

Summary of Contents for chatpod 185

Page 1: ...chatpod 185 IMPACT ACOUSTIC AG Bodenhof 4 6014 Lucerne Switzerland 180620 20min ASSEMBLY INSTRUCTIONS chatpod 185 ...

Page 2: ...2 chatpod 185 IMPACT ACOUSTIC AG Bodenhof 4 6014 Lucerne Switzerland chatpod Scope of delivery 1x A 1x G 6x H 1x I 1x J 4x K 7x 6 3x70mm L M6x40mm 12x M 1x C 1x D 1x E 1x F 1x B ...

Page 3: ...3 chatpod 185 IMPACT ACOUSTIC AG Bodenhof 4 6014 Lucerne Switzerland chatpod What you ll need in addition How the parts come together 1x 2x 1x E C F D G G L 4mm 2x 3mm 1x 13mm 1x 2 5mm 1x ...

Page 4: ...4 chatpod 185 IMPACT ACOUSTIC AG Bodenhof 4 6014 Lucerne Switzerland chatpod M M H A B ...

Page 5: ...pod 185 IMPACT ACOUSTIC AG Bodenhof 4 6014 Lucerne Switzerland chatpod Always carry the front panel A in a way that the hinges are always on top otherwise the door could accidentally open and break Attention ...

Page 6: ...PACT ACOUSTIC AG Bodenhof 4 6014 Lucerne Switzerland chatpod Assembly instructions step 1 Put the honeycomb cardboard blocks K under the base plate F Make sure that the base plate F sits well on the blocks K K K K K F ...

Page 7: ...TIC AG Bodenhof 4 6014 Lucerne Switzerland chatpod 1 Step 2 Place the sides C D on the blocks K and press them into the base plate F This should go smoothly if not make sure the sides C D are aligned with the base plate F C D 2 ...

Page 8: ...8 chatpod 185 IMPACT ACOUSTIC AG Bodenhof 4 6014 Lucerne Switzerland chatpod Step 3 Remove from the cover E the outer cladding and the honeycomb cardboard piece and lay it aside 1 2 E ...

Page 9: ... Bodenhof 4 6014 Lucerne Switzerland chatpod Step 4 Put the cover E on both sides C D and make sure they are flush on both sides The cover E should slide in smoothly The Cable which you can see in the second image should stand out 1 2 ...

Page 10: ...10 chatpod 185 IMPACT ACOUSTIC AG Bodenhof 4 6014 Lucerne Switzerland chatpod Step 5 Pull down the cover E and tighten the screws L at the same time Remove the two screws 2 for the table L L 1 2 1 1 ...

Page 11: ...od 185 IMPACT ACOUSTIC AG Bodenhof 4 6014 Lucerne Switzerland chatpod Step 6 Align the table G to the five holes and secure it with the screws L Attache the Smart phone holder J to the sheet metal G J L L 2 3 1 ...

Page 12: ...12 chatpod 185 IMPACT ACOUSTIC AG Bodenhof 4 6014 Lucerne Switzerland chatpod Step 7 Insert the rods H in the sides H H H H H H ...

Page 13: ... the cover The honey combe card board and chipboard should slide smoothly in the grove from the back wall B other wise try to align it to each other Insert the screws M and tighten hem slightly Proceed the same way with the front panel A Now tighten the screws M firmly they must be locked from the other side M M M M M M M M M A B 1 3 4 2 ...

Page 14: ...Bodenhof 4 6014 Lucerne Switzerland chatpod Step 9 Mount the door handle I in the following order lock metal ring plastic ring door handle Press the two door handles together while tightening the set screw with the 3 mm Allen wrench I I ...

Page 15: ...erne Switzerland chatpod A A B B C C D D Step 10 Plug in the cable insert the honey combe cardboard and the top part of the cover Note Only the power cable has to be plugged in the other cables are already plugged in motionsensor fan power in light 1 3 2 ...

Page 16: ...nhof 4 6014 Lucerne Switzerland chatpod Step 11 Remove the honeycomb cardboard blocks K and recycle them Check with a level if the floor plate is levelled if not rotate the levelling feet until it is Plug in the cable Well done 1 1 3 3 3 4 ...

Reviews: