Page 1: ...Panoura X ERA Pan Only Installation and Assembly Quick Guide...

Page 2: ...instructions serve as supplemental assembly guidance of the Panoura They are not meant to replace the installation manual but rather serve to complement it If there are any questions please do not he...

Page 3: ...ivision of Responsibility 2 Packaging Contents 3 Tooling Required 4 Install Column 5 Attaching the Main Top Section 6 Attach Chinrest 7 Final Leveling Critical Adjustment 8 Install Handswitch 9 Connec...

Page 4: ...staller Responsibilities Column is secured to the floor and to the wall Column is level in both axis checked with level C arm is hung on column and unit is assembled Top of C Arm frame is level Handsw...

Page 5: ...imaging software that office will plan to use e g Dexis Eaglesoft Apteryx Evasoft etc PC is connected to network and has internet access NOTE These items above will be needed to fully integrate the u...

Page 6: ...arrives in two boxes containing 1 Column Components hardcopy Install Manual 2 Main C Arm Assembly Sensor and Components 5 24 2019 6 2 Package Contents The Scanner PC arrives in two boxes containing 1...

Page 7: ...Wrenches 5 5 19 mm Cutting tool such as nippers Tool for working with electrical terminals precision screwdriver etc blade 3 5 x 0 5 mm Power drill Hammer drill if installing into masonry Masonry dril...

Page 8: ...ImageWorks Proprietary Confidential Information 5 24 2019 8 Unbox the Support Column Unit 4 Install Column...

Page 9: ...mn on the floor DO NOT ANCHOR YET Only Anchor after performing the Leveling procedure Tighten the connectors of the wall anchoring bracket Tighten them at the same position on both the left and right...

Page 10: ...movable support column section and check the angle in the front to back direction and the right to left direction The movable support column section has been designed to be stable when the main top s...

Page 11: ...slipping the included adjustment shims under the base plate Temporarily anchor the wall anchoring bracket to the wall with the four anchor bolts or lag screws The following two types of lag screws are...

Page 12: ...tall the main unit and drive the anchor bolts in the anchor hole positions Anchor the support column to the floor with 4 hexagon socket head bolts Non Concrete Floor anchoring Determine the position t...

Page 13: ...2019 13 Remove main top section and the wooden frame from the cardboard box 5 Attaching the Main Top Section IMPORTANT This component is heavy and fragile Strongly recommend 3 people 2 to lift and hol...

Page 14: ...ion To do so first set the main top section on the top surface of the support column section and then slide the main top section toward the wall until the temporary hooks are hooked After the temporar...

Page 15: ...ImageWorks Proprietary Confidential Information 5 24 2019 15 5 Attaching the Main Top Section Remove the wood frame Remove the packing bracket indicator lights section...

Page 16: ...prietary Confidential Information 5 24 2019 16 5 Attaching the Main Top Section Unscrew the screws on the packing bracket to prevent rotation and rotate the arm Remove the packing bracket bottom of ma...

Page 17: ...5 24 2019 17 5 Attaching the Main Top Section Remove the packing bracket top of arm section Remove packaging on the arm section Be sure to remove the styrofoam for cushioning during transport inserted...

Page 18: ...ImageWorks Proprietary Confidential Information 5 24 2019 18 5 Attaching the Main Top Section Connect the support column section and main top section connectors...

Page 19: ...rietary Confidential Information 5 24 2019 19 5 Attaching the Main Top Section How to run the LAN cable HUB1 When running the LAN cable HUB1 use the yellow bands attached to the equipment when it is i...

Page 20: ...formation 5 24 2019 20 5 Attaching the Main Top Section Loosen the fasten screws for the main control board mounting plate and then pull it forward Connect the connectors to the indicator lights secti...

Page 21: ...24 2019 21 5 Attaching the Main Top Section Slide the indicator lights section inside and fasten it with screws Close gently so that wires are not crushed and so that the indicator lights section is n...

Page 22: ...s Proprietary Confidential Information 5 24 2019 22 6 Attach Chinrest Attach the chin rest section to the front of the support column section Connect the support column section and chin rest section c...

Page 23: ...n the base of the arm section and check and adjust horizontality Check and adjust the angle in the front to back direction and the right to left direction Place the level on the base section of the ar...

Page 24: ...adjusting the following two locations Adjust the position of the wall anchoring bracket wall side if necessary A Right to left direction Wall anchoring bracket fasteners on wall side B Front to back d...

Page 25: ...witch Remove the Phillips pan head machine screw from the underside of the hand switch box and remove the cover Attach the wall mounting bracket to the wall so that the hole lines up the metal plate S...

Page 26: ...dotted line in the figure on the right if it runs above the dotted line it will interfere with the hand switch box circuit board and the cover may not sit flush against the wall Secure the hand switch...

Page 27: ...hand switch box circuit board Use connectors H1 and H2 Run the hand switch box cables so that they do not overlap when the cover is attached Attach the hand switch box cover taking care not to pinch...

Page 28: ...2 Ethernet cables between the back of the unit and the Scanning PC Ethernet connection 2 at the back of the X ERA must go to PC Ethernet port marked 2 PAN Control Ethernet connection 3 at the back of...

Page 29: ...Information 5 24 2019 29 10 Install Covers Attaching the bottom cover of the top 1 Attach the bottom cover for the top rear Use caution as the cephalometric type differs from the normal type Attach t...

Page 30: ...ks Proprietary Confidential Information 5 24 2019 30 10 Install Covers Attach the rear cover for the top Be careful not to crush the wiring when attaching the cover Attach the bottom cover for the top...

Page 31: ...eWorks Proprietary Confidential Information 5 24 2019 31 10 Install Covers Attaching the top cover of the arm section Attach the cover for the arm section Attaching the cable cover Attach the cable co...

Page 32: ...2019 32 10 Install Covers Attaching the front cover of the support column To attach the front cover bottom for the support column turn ON the power supply and raise the support column Attach 2 cover...

Page 33: ...ImageWorks Proprietary Confidential Information 5 24 2019 33 10 Install Covers Attach the connector caps and screw caps covers...

Page 34: ...ImageWorks Proprietary Confidential Information 5 24 2019 34 Continue with standard installation procedure from installation manual...