Iluv VIVA 1 User Manual Download Page 1

 

SUMMARY 

Declaration of CE conformity

  

Water pressure test

  

Introduction

  

Technology

Recommendations and Security

Use of softened water

VIVA Features

  

General layout

Technical features

General features

  

Programming the doses 

Producing other hot drinks 

Advises 

Cleaning and maintenance

  

General conditions

  

Checking form

 

 

 

User Manual  

Warranty and Cleaning Guide

 

Summary of Contents for VIVA 1

Page 1: ...logy Recommendations and Security Use of softened water VIVA Features General layout Technical features General features Programming the doses Producing other hot drinks Advises Cleaning and maintenan...

Page 2: ...s ci dessous This declaration refers to corresponds with the following EC directives Auf das sich diese Erkl rung bezieht mit den nachfolgenden EG Richtlinien bereinstimmt Objetode la presente declara...

Page 3: ...r conform ment aux prescriptions du paragraphe 9 4 du TDR 801 We certify that the boiler of this machine has been subjected to water pressure of 2 6 Bar complying with the paragraph 9 4 of TDR 801 Hie...

Page 4: ...ill thus be readily available for consultation by users as need be I Luv Coffee declines all responsibility for any damage that may arise as a result of failure to maintain the machines as need be of...

Page 5: ...hine should not be used by children USE OF SOFTENED WATER Whatever water treatment method is used it is important that the coffee machine operates on a permanent basis with water at a maximum of 7 TH...

Page 6: ...GENERAL LAYOUT...

Page 7: ...W 14 5 Amp 4200W 18 5 Amp Max installed power 400 V tri X 4000W 6 5 Amp phase 6200W 10 Amp phase Connection Line Cord 230 V with plug Line Cord 230 V mono Cable 5x2 5 mm 3 phases Cable 5x2 5 mm Volume...

Page 8: ...ves a full bodied taste to the coffee and provides a thick cream It contains about twice more caffeine To make a good espresso you need A fresh ground coffee A well adjusted grinder If the ground coff...

Page 9: ...EDURE FOR COFFEE A Prepare the suitable coffee dose and connect the filter holder 11 to the left hand brewhead 10 put the cup s under the spout of the filter holder 11 B Press the continuous button T5...

Page 10: ...p slightly to allow the condensation to escape Plunge the steam tube into the contents and progressively open the tap Hot water preparation Put the cup or the pot under the hot water outlet Press the...

Page 11: ...ommended quantities Check if the coffee is not ground too fine Call the after sales service department for all other problems CLEANING AND MAINTENANCE CAUTION THE MACHINE SHOULD NOT BE CLEANED BY WATE...

Page 12: ...ter holder and empty the remains of the previous preparation Place the obturator in the two cup filter holder Place a tablet of reneka detergent on the obturator Connect the filter holder Reconnect th...

Page 13: ...m tube After each use Rub a wet cloth over the spout and open the steam tube for 5 sec to purge If the tube becomes blocked more steam on opening the tap despite taking meticulous care with cleaning d...

Page 14: ...ing rack with a sponge verify the absence of foreign bodies in There is evacuation a risk of bend spillage from the dish Body Clean the machine with a wet sponge then wipe carefully with a dry cloth C...

Page 15: ...ka replacement parts Damage due to the formation of scale Damage due to external factors such as excess voltage lightning flood or fire 5 Limitations to Liability I Luv Coffee will not be held liable...

Page 16: ...1 Year Limited Warranty...

Page 17: ...cups This warranty does not cover equipment if a the Equipment has been altered modified or otherwise interfered with b the failure is due to normal wear and tear c the Equipment has been negligently...

Page 18: ...ia and 0800 458 826 New Zealand For Technical Support please contact your agent in the first instance or if unavailable our Customer Service at I Luv Coffee on toll free 1300 458 826 between the hours...

Page 19: ...ads Filter Holder Draining Rack Evacuation dish Bodywork After each use X X Daily on completion of service X X X X X Once a week X Cleaning Procedures Draining Rack Dismount and clean the grill and dr...

Page 20: ...he brew head filter holder and empty the remains of the previous preparation Place the rubber blind into the two cup filter holder and 1 cleaning tablet Steam Wand After each use If the wand becomes b...

Page 21: ...lter holder Press any button on desired group water will clean out residue from shower screen and filter holder This will stop automatically when finished Hold down both buttons simultaneously on the...

Page 22: ...out at the end of each service The cleaning solution must be cold max temp 25 C Once started the only way out of the cleaning cycle is to turn the machine off and then back on Put cleaning solution i...

Page 23: ...nel 1 If Error message showing explain to Service Technician or Supplier 2 Any un usual noises Explain to the Service Technician or Supplier 3 Qualified Electrician Only Remove Panel check the Fuses I...

Page 24: ...Ph 61 7 5507 5111 Fax 61 7 5568 7171 www iluvcoffee com au www iLuvcoffee co nz Email info essentialbrandsgroup com AUSTRALIA 1300 324 111 NZ 0800 458 826 Head Office I Luv Coffee PO Box 2661 Burleig...

Reviews: