– 1 –
Q u i c k S t a r t G u i d e
Unboxing
After opening the box, you will find…
◆
MetroLinq™ (ML2.5-60-35, ML2.5-60-19, or ML2.5-60-BF-18)
◆
PoE Power Supply
◆
Power Cable
Tools/Items Required
◆
13 mm Socket Wrench
◆
Flat-Head Screwdriver
◆
Ethernet Cables
Options
◆
Standard Bracket ICC-BRACKET-STD
◆
Long Range Precision Bracket ICC-BRACKET-LR
◆
Alignment Scope ICC-SCOPE-9x50
For helpful training and user-case information, please go to
ignitenet.com/support
Assembly
The MetroLinq™ Standard Bracket and Long Range Precision Bracket
(both ordered separately) are designed for wall and pole mounting
(25 mm - 80 mm pole diameter). Choose what is best for your
location and select hardware accordingly.
Grounding
Welcome to MetroLinq™
Interference-Free Gigabit Wireless
Ensure all four position-locking bolts on the Standard
Bracket are tight before installing.
1
Install the Standard Bracket onto MetroLinq™ using four M8
bolts, lock washers, and flat washers.
Ensure the structure on which the unit is to be mounted is
properly grounded and in compliance with ETSI ETS 300
253.
Verify that there is a good electrical connection to a
grounding point (no paint or isolating surface treatment).
Use the included (M4) screw to attach a grounding wire (not
included) to the grounding point on the unit, and then to
ground.
Caution:
The earth connection must not be removed
unless all supply connections have been disconnected.
2
1
2
MetroLinq 2.5G
E102017-CS 15020000xxxxA R01
MetroLinq
™
2.5G Outdoor 60 GHz PTP/PTMP + 5 GHz
ML2.5-60-35 | ML2.5-60-19 | ML2.5-60-BF-18
www.ignitenet.com