52
•
Do not use air ducts that do not comply with the installation requirements.
•
Choke clogged due to lack of maintenance makes it difficult to ignite.
•
The maximum fuel filling height recommended for the fuel tank of the boiler is 5 cm
below the top level of the tank.
•
Improper installation, use and insufficient maintenance will cause an increase in
malfunctions.
•
If the ignition does not occur properly, the boiler must be closed and the combustion
chamber cleaned.
•
The product should be stored in a dry place and not exposed to unfavorable weather
conditions.
•
If the boiler is not to be operated for a very long time, it must be kept in water
without any water.
•
The lime layer that can be formed in the water parts of the boiler decreases the
boiler efficiency and causes the boiler to overheat. Therefore, necessary precautions
should be taken against lime. (Lime remover chemical)
Customers not obeying the above requirements and schemas
cannot claim any right for any problem. In any case, contact your
dealer or IFYIL.
2.
TECHNICAL SPECIFICATIONS
•
This device should be installed in accordance with the related regulation and EU
standards.
EN 303-5 Heating boilers for solid fuels, manually and automatically
stoked, nominal heat output of up to 500 kW- Terminology,
requirements, testing and marking
2006 / 42 / EC- Machinery Directive
Summary of Contents for GT-15
Page 1: ...0 2019 PELET KAZANI KULLANMA KILAVUZU PELLET BOILER USERGUIDE Rev No 2019 1 1...
Page 2: ...1...
Page 29: ...28 8 TEMEL PAR ALAR VE BOYUTLAR Model GT 15...
Page 31: ...30 Model GT 25...
Page 33: ...9 BA LANTI EMALARI 9 1 Anakart Model GT 15 GT 25...
Page 74: ...73 8 MAIN PARTS AND DIAMENTIONS Model GT 15...
Page 76: ...75 Model GT 25...
Page 78: ...9 CONNECTION SCHEMAS 9 1 Mainboard Model GT 15 GT 25...
Page 98: ......
Page 99: ......