54
6.
FUEL CALIBRATION
Calibration should be carried out during commissioning of the products and in
case of replacement of the pellet used. The first calibration process (installation)
must be performed by the service. Calibration procedure should be done when
the boiler is cold and not working.
Before starting the calibration process, place a bowl where you can weigh the
pellet at the drop point of the pellet. (If there is no pellet in the feeding auger,
press the
”Set“ key. In Loading menu
, move the state to On position. After to
place the pellet in the bowl that you have placed, loading menu
can do "off”
)
Press the "Set” but
ton. Go to Loading menu and Set the status from "off" to
"on". The pellet feed will then be activated and the pellet will feed continuously
for 3 minutes. At the end of this period, perform the loading again. Weigh the
pellet at the end of this 6-minute loading. Compare the result of this weighing in
grams. Change the P05 and T03 parameter values by selecting the closest
value.
Do this only if you change the pellet that you use after the initial service
and you experience a decrease in performance.
You can make the changes by following the steps below.
To change parameter P05; Press and hold the "Set" button for 3 seconds. Select
’’ S
ystem" from the menu that appears. You will be asked to enter the
password. Contact your service provider for a password. Then select "screw"
menu. You can reach the parameter value P05 with the up / down arrow keys.
To change parameter P03; Press and hold the "Set" button for 3 seconds. Select
’’ System" from the menu that appears. You will
be asked to enter the
password. Contact your service provider for a password. Then select "timer"
menu. You can reach the parameter value P03 with the up / down arrow keys.
Summary of Contents for GALATA
Page 2: ...1...
Page 25: ...24 8 TEMEL PAR ALAR VE BOYUTLAR Model Galata...
Page 27: ...9 BA LANTI EMALARI 9 1 Anakart...
Page 61: ...60 8 MAIN PARTS AND DIMENSIONS Model Bosphorus...