SmartModul CR2512
12
CR2512
Operating status
Status LED
Test standards and regulations
Climatic test
Moisture/heat to EN 60068-2-30, test Db
(
≤
95% rel. humidity, non-condensing)
salt mist test to EN 60068-2-52, test Kb, severity level 3
protection test to EN 60529
Mechanical resistance
vibration to EN 60068-2-6, test Fc
shock to EN 60068-2-27, test Ea
bump to EN 60068-2-29, test Eb
Immunity to
to ISO 7637-2, pulses 2a, 3a, 3b, severity level 4, function state A
conducted interference
to ISO 7637-2, pulse 5, severity level 4, function state B
to ISO 7637-2, pulse 1, 2b, severity level 4, function state C
Immunity to interfering fields
according to UN/ECE-R10 at 100 V/m (E1 type approval)
and EN 61000-6-2 (CE)
Interference emission
according to UN/ECE-R10 (E1 type approval)
and EN 61000-6-4 (CE)
Control systems
\DATEN\100\DB-FORM—PZD/03/12/96
ifm electronic gmbh • Friedrichstraße 1 • 45128 Essen
06.11.2014
We reserve the right to make technical alterations without prior notice.
CR2512 / page 2
LED
Status
Description
green
OFF
no supply voltage
ON
module in stand-by mode
CANopen status: PREOPERATIONAL / PREPARED
outputs = OFF
1.0 Hz
At least one input was configured as node ID selector.
After power on LED flashes n times according to the set
node ID offset.
Then the module changes into the CANopen status
PREOPERATIONAL
2.0 Hz
module active
CANopen status: OPERATIONAL
outputs are updated
red
OFF
communication OK
ON
communication disturbed
• node guard / heartbeat error
(if node guarding/heartbeat is activated)
• no synch objects
(if synch monitoring is activated)
During the start-up or reset of the controller
the green and the red LEDs light simultaneously.
This appears as orange.