10  Operation

After every power on all LEDs light and go out again step by step (during this time 

the output is closed if configured as normally open)� The unit is then ready for 

operation�
In case of power failure or interruption all settings remain�

Operating indicators 

         

Green LED bar: Current flow within the represen-

tation range�

Indication of the switch point (SP):

- LED orange: output closed�

- LED red: output open�

         

LED 9 flashes: current flow above the

representation range�

         

LED 0 flashes: current flow far below the represen-

tation range�

Interference indicator

         

         

Short circuit at the switching output:

The operating indicator and red LEDs light 

alternately� 

If the short circuit has been rectified, the unit imme-

diately passes into the normal operating state�

The current operating state is displayed�

Display OFF

(no LED lights):

Operating voltage too low (< 19 V) or failed�

Ensure a correct voltage supply�

11  Maintenance

Recommended maintenance: 

 

► Check the sensor tip for build-up from time to time� 

 

► Clean it using a soft cloth� Stubborn build-up (e�g� lime) can be removed using 

a common vinegar cleaning agent�

Summary of Contents for SI0550

Page 1: ...Operating instructions Flow monitors SI0550 11458776 00 08 2010 UK...

Page 2: ...4 3 Mounting operation 6 5 Electrical connection 7 6 Operating and display elements 7 7 Set up and settings for water 8 7 1 Change the switch point optional 8 7 2 High flow adjustment optional 9 8 Add...

Page 3: ...nd EC directives Improper or non intended use may lead to malfunctions of the unit or to unwan ted effects in your application That is why installation electrical connection set up operation and maint...

Page 4: ...s flowing output open if no medium is flowing This applies to the unit on delivery output normally open In case of need you can change the output to normally closed 8 2 It then applies output open if...

Page 5: ...lation location General The sensor tip is to be completely surrounded by the medium Insertion depth of the sensor minimum 12 mm Recommended For horizontal pipes mounting from the side For vertical pip...

Page 6: ...ed emptied are to be avoided due to the high measuring sensitivity of the units 4 3 Mounting operation Ensure that the system is free of pressure during installation Ensure that no media can leak at t...

Page 7: ...8 5 1 BN brown 2 WH white 3 BU blue 4 BK black Use 4 wire connection cables without a link between pins 2 and 4 With 3 wire sockets with a link between pin 2 and pin 4 switching of the output stage t...

Page 8: ...2 3 Your normal flow exceeds the representation range of the display LED 9 flashes Carry out high flow adjustment 7 2 You can restore the factory setting any time 8 3 7 1 Change the switch point optio...

Page 9: ...you should additionally adapt the unit to the minimum flow Note The following adjustment must only be carried out after the high flow adjust ment Let the minimum flow circulate in the installation or...

Page 10: ...adapt the unit to new flow conditions any time Apply the operating voltage for 5 10 s to Pin 2 high flow adjustment Apply the operating voltage for 10 15 s to Pin 2 low flow adjustment This adjustment...

Page 11: ...the representation range LED 0 flashes current flow far below the represen tation range Interference indicator Short circuit at the switching output The operating indicator and red LEDs light alterna...

Page 12: ...12 12 Scale drawing 22 1 2 113 60 65 14 8 2 45 50 27 63 M12 x1 3 1 LED bar display 2 set button 3 tightening torque 25 Nm...

Page 13: ...esponse time s 1 Pressure resistance bar 300 Operating temperature C 25 80 Protection rating IP 67 Protection class III Shock resistance g 50 DIN IEC 68 2 27 11 ms Vibration resistance g 20 DIN IEC 68...

Reviews: